Similar Projects
Gate Valve and Reducing Nipple
Post-Bid
Norfolk, VA

Annual Services Construction Contract 18
Term Contract
Post-Bid
Virginia Beach, VA

Replace Potable Water Line
Results
Norfolk, VA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Utility Repair Contract
Term Contract
Post-Bid
Norfolk, VA

River Oaks, Pump Station 44 Service Area, Phase 1, Water and Sewer Replacement
Results
$1,672,184 est. value
Norfolk, VA 23510

Wards Corner Service Area 150 Gravity Sewer and Water Main Replacement - Phase 6
Results
Less than $5,274,581 est. value
Norfolk, VA

Master Meter Vault Rehabilitation
Results
Less than $872,000 est. value
Norfolk, VA

ORF Domestic Water Line Replacement
Results
Norfolk, VA 23518

Miscellaneous Plug Valves - Virginia Initiative Plant
Results
Norfolk, VA 23508

Flange to Flange Plug Valve - VIP
Results
Hampton, Norfolk, VA 23508

Residential Cold Water Meters
Infrastructure
Results
Virginia Beach, VA

Compound and Fire Cold Water Meters
Infrastructure
Results
Virginia Beach, VA

Fire Hydrants, Hydrant Extension and Collision Kits
Infrastructure
Results
Norfolk, VA

Annual Construction Contract for Utility Replacement FY2021
Infrastructure
Results
Less than $24,323,619 est. value
Norfolk, VA

Reported 02/03/2022 12:00 AM
Project Title

Replace Condenser Water Loop Piping

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA   (Norfolk City County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8) The work includes demolition of the existing closed loop water source heat pump system condenser loop piping and provide new condenser loop piping. Portions of the existing lay-in ceiling system shall be removed and replaced as indicated to facilitate removal and installation of the new condenser loop piping. Gypsum board ceilings in indicated rooms and areas shall be removed and replaced with lay-in ceiling systems as indicated. The existing fire protection sprinkler heads shall remain. The sprinker escutcheons shall be removed, stored and reinstalled in the new lay-in ceiling systems. All electrical equipment including lighting fixtures, lighting controls, audio/visual equipment and electronic security devices shall be removed, stored, to facilitate removal of the ceiling systems and reinstalled in the new ceiling systems. The existing ceiling mounted diffusers and grilles located in the areas involving ceiling removal and replacement shall be removed, stored and reinstalled in the new ceiling systems. New grilles, lighting fixtures and associated electrical appurtenances shall be provided in the new lay-in ceiling systems serving the indicated toilet/shower rooms.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents