Similar Projects
Valvoline Planet - Oil Change Center
New Construction - 2,450 SF
Conception
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48314

Pronto Freight Ways - Addition
Addition - 16,500 SF
Conception
Taylor, MI 48180

Alpha Court - Industrial Building
New Construction - 39,958 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Wixom, MI 48393

ABRA - Auto Body Repair of America - Vehicle Repair Facility
New Construction - 22,423 SF
Design
Kentwood, MI 49512

Jiffy Lube Multi-Care Services
New Construction - 3,478 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Belleville, MI 48111

Christian Brothers Automotive Service Center
New Construction - 5,875 SF
Post-Bid
Grand Rapids, MI 49525

Bierlein Maintenance Shop - Addition
Addition - 21,792 SF
Post-Bid
Midland, MI 48642

Envy Auto Group
Renovation
Construction
Saint Clair Shores, MI 48080

Adell Center
New Construction
Construction
$125,000,000 est. value
Novi, MI 48375

Szott Auto
New Construction
Pending Verification
Lyons, MI 48165

Summit View Townhomes and Villas
New Construction, Demolition
Pending Verification
Milford, MI 48381

Madison Avenue Building
New Construction, Demolition - 60,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Grand Rapids, MI 49507

Utilities Instrumentation Service, Inc. (UIS) - New Building
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Dexter, MI 48130

P404 Reserve Center and Vehicle Maintenance Facility at Battle Creek, MI
New Construction
Post-Bid
$25,000,000 to $100,000,000 est. value
Battle Creek, MI

FedEx Ground Build to Suit
New Construction - 320,988 SF
Construction
$21,404,147 est. value
Kalamazoo, MI 49002

Last Updated 05/06/2020 10:14 AM
Project Title

Rapids Drive Distribution Center and Fleet Maintenance Building

Physical Address View project details and contacts
City, State (County) Gaines, MI 48436   (Genesee County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Vehicle Sales/Service
Contracting Method
Project Status Construction Complete as of first quarter 2021
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

,, 223,214 SF - Industrial Warehouse, 206,514 SF New Construction, Vehicle Sales/Service, 16,700 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents