Similar Projects
Force Main Emergency Repair Materials
Post-Bid
Sayreville, NJ 08871

Emergency Repair Work
Post-Bid
Mount Laurel, NJ

Morris Avenue Watermain Improvements
Results
$161,900 est. value
Spring Lake, NJ 07762

Brielle Water System Improvements
Results
$1,624,375 est. value
Brielle, NJ 08730

Lake Hiawatha Water Main Replacement Phase 1
Post-Bid
Parsippany, NJ 07054

Lead Service Line Replacement - Phase 1A
Results
Trenton, NJ

Design of New Potable Water Interconnection With Newark Water
Post-Bid
Clifton, NJ

Phase 3 and 4 Water Main Replacement
Results
Less than $5,736,549 est. value
Jersey City, NJ

Process Water Strainers Replacement
Post-Bid
Sayreville, NJ

Carol Drive Water Main Replacement
Results
Millville, NJ 08332

Alpha Water Utility SCADA Improvements
Post-Bid
Alpha, NJ

Cook Street Water Main Relocation
Results
Jersey City, NJ

Replacement Parts for Moyno Pumps
Post-Bid
Rahway, NJ

Underground Utility Service
Results
Edison, NJ 08818

Disconnection of Water Services at the Water Main
Post-Bid
Trenton, NJ 08608

Last Updated 12/02/2020 12:39 PM
Project Title

West Main Street Water Main Replacement Phase II

Physical Address View project details and contacts
City, State (County) Clinton, NJ 08809   (Hunterdon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include but is not limited to the installation of approximately 1,650 linear feet of twelve-inch (12") and approximately 90 linear feet of eight-inch (8") DIP potable water mains, which includes the tie-in connection at the intersection of West Main Street and the off ramp of Interstate Route 78 West, the tie-in connection at the intersection of Hancock Street and West Main Street, and the tie-in connection to the existing water main installed during Phase I located in front of the Clinton House (2 West Main Street). This process will also consist of service connections, valves, fire hydrants, site restoration, paving, and related appurtenances. The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents