Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Reinig Road Culvert Replacement on Brockway Creek
New Construction
Design
$500,000 est. value
WA

Replace Existing Wastewater Lift Station 3
Renovation
Design
$200,000 est. value
Lacey, WA 98503

Main Industrial Pump Station Rehabilitation
Renovation
Bidding
$400,000 est. value
Vancouver, WA

Fry Creek Pump Station
New Construction
Bidding
$16,200,000 est. value
Hoquiam, WA 98550

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Campus Remodel
Renovation
Bidding
$165,000 est. value
Woodinville, WA 98072

Biosolids Dewatering and Lift Station Improvement
Renovation
Post-Bid
Twisp, WA

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

WWTP Drain Lift Station Replacement
Infrastructure
Bidding
$265,000 est. value
Granite Falls, WA

Emerson Avenue Wastewater Pump Station
New Construction
Post-Bid
Hoquiam, WA 98550

Water Filtration Plant Phase 2
New Construction
Results
Everett, WA

Last Updated 07/06/2022 12:16 PM
Project Title

McCormick Village Park Splash Pad Water Treatment Facility Installation

Physical Address View project details and contacts
City, State (County) Port Orchard, WA 98367   (Kitsap County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $472,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes: a new package pump station and treatment building that will treat water recycled from the existing McCormick Woods Splash Pad. The Project Will Be Completed in Two Phases: Preconstruction Phase and Construction Phase. The Preconstruction Phase Shall Begin Within Five (5) Days of the Contract Start Date and Include Submittals Review, Equipment Procurement, Requests for Information, and Work Directives, if Needed. The Construction Phase Includes the Installation of the Treatment Equipment and Shall Begin No Earlier Than September 12, 2022, After the Summer Season for the Splash Pad Has Concluded. The Total Anticipated Duration of Both Phases Is Seven (7) Months From the Contract Start Date. Construct a 20'-4" x 11'-0" building o Furnish and install one duplex package grinder pump station o Furnish and install a new solenoid control panel o Furnish and install one booster pump o Furnish and install one media filter o Furnish and install six hydro pneumatic tanks o Furnish and install one sodium hypochlorite (chlorine solution) feed system, o Furnish and install one peracetic acid (pH adjustment solution) feed system, o Furnish and install piping o Relocated the existing solenoid valve control system o Furnish and install electrical equipment, o Furnish and install landscaping and fencing, o Furnish and install sitework.

Details

Water Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents