Similar Projects
James E. Potvin Industrial Park Expansion - City of Cadillac
Infrastructure
Conception
$600,000 CJ est. value
Cadillac, MI 49601

James E. Potvin Industrial Park Expansion - City of Cadillac
Infrastructure
Conception
$600,000 CJ est. value
Cadillac, MI 49601

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Evart Street Improvements
Results
Less than $910,000 est. value
Cadillac, MI 49601

Lester Street - City Of Cadillac
Infrastructure
Conception
$675,000 CJ est. value
Cadillac, MI 49601

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Stimson Street Improvements
Results
Less than $280,000 est. value
Cadillac, MI

Elmer Street - City Of Cadillac
Infrastructure
Conception
$400,000 CJ est. value
Cadillac, MI 49601

Lincoln Elementary School Parking Lot Rehabilitation Project
Infrastructure
Post-Bid
Cadillac, MI

Quanicassee River BAS - Improvements
Results

Carmel Street - City of Cadillac
Infrastructure
Conception
$225,000 CJ est. value
Cadillac, MI 49601

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Rest Area ADA Improvement Lower Northwest Peninsula-Interior
Results

Last Updated 09/09/2022 12:36 AM
Project Title

West Division Street - City of Cadillac

Physical Address View project details and contacts
City, State (County) Cadillac, MI 49601   (Wexford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace a section of W. Division Street from Leeson Avenue to Boon Street, including crushing and shaping existing HMA, HMA paving, Sanitary Sewer upgrades. As of September 09, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents