Similar Projects
Guarded Rail Replacement
Infrastructure
Results
$14,483,347 CJ est. value
Pittsburgh, PA 15212

Heavy Metal Remediation Project
Alteration
Post-Bid
$250,000 est. value
Weatherly, PA 18255

Corrugated plastic pipe and Headwall
Infrastructure
Post-Bid
$63,000 CJ est. value
Harris Township, PA 16801

23 WM Metal Posts
Term Contract
Post-Bid
New Bethlehem, PA 16242

Riverfront Office Center 5th Floor partition wall project
Renovation
Post-Bid
$40,000 CJ est. value
Harrisburg, PA 17104

1140-Steel
Alteration
Post-Bid
Albion, PA 16475

5th Avenue Guide Rail Installation
Infrastructure
Results
$53,600 CJ est. value
Chambersburg, PA 17202

Eureka Wastewater Treatment Plant Influent Pumping Station Hoist System Replacement Project
Alteration
Results
$86,000 est. value
North Wales, PA 19454

Masonry and Structural Steel Services for Gas Processing Department
Alteration
Results
Philadelphia, PA 19153

I-84 Cable Median Barrier
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Delaware Township, PA 18337

Additional Natatorium Guardrails
Renovation
Results
$61,750 CJ est. value
McMurray, PA 15317

Replacement of Steel Sheet Roofing
Renovation
Post-Bid
$30,000 CJ est. value
Finleyville, PA 15332

Last Updated 09/20/2023 01:36 PM
Project Title

Interstate 84 Cable Median Barrier

Physical Address View project details and contacts
City, State (County) Dunmore, PA 18512   (Lackawanna County)
Category(s) Single Trades
Sub-Category(s) Steel
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the Installation of Cable Median Guide Rail in Certain Sections of Highway in Lackawanna County, Jefferson, Madison, Elmhurst, and Roaring Brook Township, and Wayne County, Salem Township, Commonwealth of Pennsylvania, State Route 0084, Section Cmb. The Work Will Include Testing, Foundation Installation, Installation of Cable Median Guide Rail and the Installation of Guide Rail. Traffic Control Measures Include Short Term Lane and Shoulder Closures. All Work Contained Within an Overall Length of 21,596 Linear Feet (4.09 Miles) as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Guide Rail Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Interstate 84 Cable Median Barrier *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents