Similar Projects
Valley Springs Middle School Mechanical Upgrade
Bidding
Arden, NC 28704

Removal and Replacement of Two (2) Hot Water Heaters
Bidding
Wilmington, NC

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

J--Chiller Inspection and Maintenance
Post-Bid
Asheville, NC 28805

Steam Distribution System Replacement Phase IV-A
Results
Less than $2,000,000 est. value
Greensboro, NC

South Wilmington Street Center - Mechanical System Replacement
Results
Raleigh, NC

Boiler Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Boiler Replacement in Killian Building
Results
Less than $61,890 est. value
Flat Rock, NC

Hope Mills Library Boiler Replacement
Post-Bid
Hope Mills, NC 28348

Ultrasoft Water Softener Unit
Results
Camp Lejeune, NC 28547

Blue Ridge Community College Spearman Building Boiler 1 Replacement
Post-Bid
Flat Rock, NC 28731

Northern Wake Campus Exterior Hydronic Piping and Equipment Addition
Results
Raleigh, NC

Reverse Osmosis System for 30 Locations
Post-Bid
NC

North Buncombe Elementary School Boiler Replacement
Results
Less than $74,367 est. value
Weaverville, NC 28787

Trane Chiller CH530 Controller Replacement for USCG Base Elizabeth City
Post-Bid
Elizabeth City, NC 27909

Reported 12/14/2019 12:00 AM
Project Title

Upgrade Chiller Plant Fort Bragg, NC

Physical Address View project details and contacts
City, State (County) Fort Bragg, NC 28307   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Set Aside: 8(a). This project will upgrade the building level chiller plant serving the United States Army Forces Command (FORSCOM)/United States Army Reserve Command (USARC) Headquarters (HQ's) and the Installation Process Node (IPN) facility. The proposed construction will install new chiller plant efficiency software; upgrade the cooling tower; add a modulating valve for the heat exchanger (HX) along with associated piping and install a rooftop chiller modulating valve to tie in the existing rooftop air-cooled chiller into the main cooling loop. The project will recommission the host Utility Management Control System (UMCS).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents