Similar Projects
HVAC System Upgrades Flint Hill Elementary School
Alteration
Bidding
Vienna, VA 22181

Metro Hanger HVAC
Alteration
Bidding
Henrico, VA 23250

Maintenance and Repair Services for Fume Hoods/Controllers
Post-Bid
Annandale, VA 22003

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters MERV 13
Term Contract
Results
Falls Church, VA 22042

HVAC Preventative Maintenance
Term Contract
Results
Herndon, VA

A.O. Smith LP Gas-Hot Water Heater 100 Gallon-Proprietary
Alteration
Bidding

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Alexandria, VA 22310

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Meadowlark Botanical Gardens Atrium Rooftop Equipment Replacement
Results
Less than $400,000 est. value
Vienna, VA 22182

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Alexandria, Vienna, VA 22314

Mason Neck State Park Residence HVAC System Replacement
Alteration
Post-Bid
Lorton, VA 22079

Drinking Water Replacement Chiller
Alteration
Results
Fairfax, VA

Last Updated 01/21/2022 05:30 AM
Project Title

Automatic Temperature Control System Replacement at Rachel Carson Middle School

Physical Address View project details and contacts
City, State (County) Herndon, VA 20171   (Fairfax County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The system to be controiied under work of this section is basically comprised of the building HVAC system. The HVAC systems being controlled are Boilers, Chillers, Cooling Towers, Associated Pumps, Air Handling Units, Makeup Air Units, Fan Coil Units, Unit Ventilators, and Exhaust Fans. These specifications define the manner and methods by which these controls. The project scope shall include all associated related work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents