Similar Projects
Pond and Drainage System Construction
Bidding
De Pere, WI

Curb Repair and Street Resurfacing
Bidding
De Pere, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

Boardwalk Replacement
Results
De Forest, WI 53532

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

Sharon Hall Aluminum Handicap Ramp
Bidding
Sharon, WI

Culverts
Term Contract
Post-Bid
WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Flooding Repairs - Waisman Center
Bidding
Less than $136,000 est. value
Madison, WI

Concrete Culverts
Post-Bid
WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Academy Parking Lot Reconstruction
Bidding
Less than $270,000 est. value
Fort McCoy, WI

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Last Updated 03/04/2021 06:40 AM
Project Title

Site Utility Distribution System Replacement - Phase 1

Physical Address View project details and contacts
City, State (County) Eau Claire, WI   (Eau Claire County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of approximately 1200 lineal feet of new direct buried steam and condensate pipes (including two Broadway Street crossings), two new steam pits, approximately 130 lineal feet of new electrical ductbank, removal of existing steam box conduit, pipes, and pits, associated surface demolition and reconstruction, including electrical and lighting, retaining wall, asphalt parking lot, concrete roadway, sidewalk, sod and signing. Project includes traffic control (detour and lane closure) along Broadway Street (also STH 25/STH 29).

Details

Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents