Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

2021 Seal Coating
Post-Bid
Delavan, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Lake Geneva - Kenosha, CTH O - STH 75, 236th Avenue - 125th Avenue
Results
Kenosha, Lake Geneva, WI

2021 Road Improvements
Post-Bid
Lyons, WI

2021 Multi Use Trail
Results
East Troy, WI 53120

Townline Road Reconditioning
Renovation
Results
WI

S and D Townline Road Reconditioning
Results
WI

TBR 2021-1 Creek Road Reconditioning
Renovation
Results
Delavan, WI 53115

CTH-ES (Main Street) West Street to STH-20
Results
Walworth, WI

TW 2021-1 Willow Bend Road Reconditioning
Renovation
Results
Walworth, WI 53184

2021 Street and Utility Improvements
Results
Delavan, WI

2021 Street Improvements
Renovation
Results
Darien, WI

East Troy Business Park South
Results
East Troy, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Last Updated 09/20/2021 04:07 AM
Project Title

USH 12 - Structures, STH 50 to STH 67; Lake Geneva - Elkhorn Road (USH 12), EB STH 50 to STH 67; Lake Geneva - Elkhorn Road (USH 12), WB STH 50 to STH 67

Physical Address View project details and contacts
City, State (County) Lake Geneva, WI 53147   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 4,317 CY; Borrow, 13,705 CY; Backfill Structure, 760 Ton; Base Aggregate Dense, 26,456 Ton; Breaker Run, 7,075 Ton; Concrete Pavement, 475 SY; Concrete Masonry Overlay Decks, 98 CY; Bar Steel Reinforcement, 10,599 Lbs; Bar Steel Reinforcement Coated, 6,676 Lbs; Marking Epoxy, 11,627 LF; Construction Staking, 3 LS; Culvert Pipe, 4 LF 18”, 24 LF 18“, 16 LF 24“, 16 LF 30“, 16 LF 36“; Storm Sewer Pipe, 406 LF 18“; Concrete Curb and Gutter, 1,085 LF; Beam Guard, 44,653 LF; Beam Guard Energy Absorbing Terminals, 40 Each; Asphaltic Surface, 1,446 Ton; HMA Pavement, 154,781 Ton; Removing Asphaltic Surface Milling, 146,111 SY; Tack Coat, 78,641 Gals; Signs, 1,047 SF; Polymer Overlay, 4,090 SY; Fence Woven Wire 4-Ft, 464 LF; Marking Line Grooved Wet Ref Epoxy 4-Inch, 276,297 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents