Similar Projects
Rooftop Unit Replacements at Thoreau Elementary School- Sub
Renovation
Bidding
$674,000 CJ est. value
Concord, MA 01742

Pole and Pad Mount Transformers
Term Contract
Sub-Bidding
Belmont, MA 02478

Design of a Traffic Signal Reconstruction at the Intersection of Main Street, Barbara Road, Warren Street and Gore Road, 2nd Issue, 2023
Infrastructure
Sub-Bidding
$300,000 CJ est. value
North Waltham, MA 02452

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

Substation 4 Transformer Testing & Repairs
Alteration
Post-Bid
Reading, MA

Well 4 Water Treatment Plant Upgrades - Phase 1 - Sub Bid
Renovation
Results
$7,292,036 CJ est. value
Maynard, MA 01754

Cambridge Electrical Department - The Shop - Slab Replacement - Sub Bid
Alteration
Results
$1,000,000 est. value
Cambridge, MA 02141

Traffic Signal Installation at Edgell Road
Infrastructure
Sub-Bidding
$2,598,000 CJ est. value
Framingham, MA 01701

Theatrical Dimming System Upgrade at Canton High
Renovation, Alteration
Post-Bid
$85,000 est. value
Sudbury, MA

On-Call Electrical Services
Term Contract
Results
$100,000 est. value
Lowell, MA

Installation of Emergency Generator and Related Equipment
Infrastructure
Sub-Bidding
$160,000 CJ est. value
Hudson, MA 01749

General Electric Work at Town Facilities for Fiscal Year 2023
Term Contract
Post-Bid
$15,000 est. value
Tyngsborough, MA

Brady Tower Development Various Electrical & Systems Replacements
Alteration
Results
$260,100 est. value
Somerville, MA

Bryant Manor Panelboard and Transformer Replacement - SUB
Renovation
Sub-Bidding
$490,587 CJ est. value
Somerville, MA 02145

Electrical Labor Only
Alteration
Post-Bid
$99,000 est. value
Somerville, MA

Last Updated 09/16/2023 01:33 AM
Project Title

Wright Way Sewer Pump Station Upgrade Project - Sub

Physical Address View project details and contacts
City, State (County) Ayer, MA 01432   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $87,280 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Wright Way Sewer Pump Station Upgrade Project. The work consists of demolishing the interior pumping and equipment in the station, installing a new duplex submersible pumping system, installation of new level controls, modifications to the existing structure to incorporate a valve vault and new wet well within the structure, new access hatch and vents, new exterior motor control center on an exterior pad, manual transfer switch with plug connection for a portable generator, and construction of a new pump station valving All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Town of Ayer DPW Water and Sewer Superintendent by mail, e-mail (kabraham@ayer.ma.us), or FAX (978-772-8244) Question Deadline 08/20/2023

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents