Similar Projects
River Oaks C-Store
New Construction
Conception
Myrtle Beach, SC 29579

Riverwood Drive and Old Kings Hwy
Infrastructure
Conception
$4,545,000 CJ est. value
Murrells Inlet, SC 29576

East Coast Greenway - River Oaks Dr / Frontage Rd B-2
Infrastructure
Design
$25,650 CJ est. value
Myrtle Beach, SC 29579

Kayak Launch at Thunderbolt Park
Infrastructure
Design
$198,985 CJ est. value
Myrtle Beach, SC 29577

Widening - SC 9 (Horry County)
Infrastructure
Bidding
$20,200,000 CJ est. value
Loris, SC 29569

Roadway Repair Package
Infrastructure
Bidding
$900,000 CJ est. value
Conway, SC 29526

7-Eleven
New Construction - 4,088 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Myrtle Beach, SC

18th Avenue North Ocean Outfall
Infrastructure
Post-Bid
$12,000,000 CJ est. value
North Myrtle Beach, SC 29582

HCS Transportation Training Pad
Term Contract
Results
Conway, SC 29526

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Mavis Tires And Brakes
New Construction - 6,730 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Myrtle Beach, SC 29588

7 Eleven #41635
Renovation, Demolition - 4,558 SF
Construction
Surfside Beach, SC

Pepsi Bottling Ventures Plant at Palmetto Coast Industrial Park Building 4
New Construction, Infrastructure - 164,850 SF
Pending Verification
$18,000,000 CJ est. value
North Myrtle Beach, SC 29568

17th Avenue North Resort Multi-Residential
New Construction, Infrastructure - 23,775 SF
Pending Verification
$6,500,000 CJ est. value
Myrtle Beach, SC 29577

US 501 Realignment from Broadway Street to 7th Avenue North
Infrastructure
Conception
$12,400,000 CJ est. value
Conway, SC 29526

Last Updated 01/12/2023 02:12 PM
Project Title

Valvoline Oil Change / Myrtle Beach - Rebid

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC 29579   (Horry County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Negotiated General Contractor To Subcontract, Bids by Invitation
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the Negotiated GC.

Details

3,075 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents