Similar Projects
Harbaugh Valley Road Bridge
Infrastructure, Renovation
Conception
$325,000 CJ est. value
Fairfield, PA 17320

Harbaugh Valley Road Bridge
Infrastructure, Renovation
Conception
$325,000 CJ est. value
Fairfield, PA 17320

PA 116 over Trib Marsh Crk
Infrastructure
Design
$1,234,000 CJ est. value
Gettysburg, PA 17325

PA 116 over Trib Marsh Crk
Infrastructure
Design
$1,234,000 CJ est. value
Gettysburg, PA 17325

Pavement Preservation Project
Infrastructure
Post-Bid
$200,000 est. value
Whitehall, PA

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

2022 Roadway Improvements
Infrastructure
Results
Hanover, PA

Roadway Overlay and Asphalt Paving Fabric
Infrastructure
Results
Gettysburg, PA

Willoughby Run Self-Storage Facility
New Construction, Infrastructure - 44,500 SF
Pending Verification
$4,800,000 CJ est. value
Straban Township, PA 17325

Centenial Road Bridge PM
Infrastructure, Renovation
Conception
$540,000 CJ est. value
Gettysburg, PA 17325

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Polymer Modified Cationic Fog Seal
Infrastructure
Post-Bid
Gettysburg, PA

Seal Coat
Infrastructure
Results
Fairfield, PA

PA 116 Main Street Resurface
Infrastructure
Conception
$823,170 est. value
McSherrystown, PA 17344

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Last Updated 08/15/2023 05:15 PM
Project Title

Construct Parking Lot at Long Pine Reservoir

Physical Address View project details and contacts
City, State (County) Gettysburg, PA 17325   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $128,300 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2023, construction is underway, however, information regarding the awarded general contractor and an exact timeline for construction have not been confirmed. Work included under this contract consists of constructing a parking lot at Long Pine Reservoir to include: installing all necessary perimeter E&S controls; clearing, grubbing, and stockpiling topsoil; complete bulk earthwork; haul off excess spoil; construct channels, install channel lining, culvert, rock filters, and riprap apron; spread topsoil where all subgrade elevations have been achieved; complete fine grading; seed and mulch areas at final grade; install erosion control blankets; install new gravel pavement; install boulders and concrete parking curbs; and restore all disturbed areas. Engineers Estimate: $100,000 - $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Submit questions regarding the technical specifications and/or the drawings to Adam Watchey at awatchey@pa.gov. All other questions shall be directed to the Construction Management Section at RA-NRFDC_CONTRACTING@pa.gov.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents