Similar Projects
12K Tanks
Post-Bid
CO

21 K Fiber Glass Tanks
Post-Bid
CO

Put Hill Finish Water Storage Tank
Results
Pagosa Springs, CO

3rd Party Natural Gas Services
Results
Grand Junction, CO

Stock Water Pipeline and Bottomless Tanks
Post-Bid
Sterling, CO 80751

Catamount Ranch Water Tank Improvement
Results
Steamboat Springs, CO

Central Platte Campus CNG Feuling Complex Maintenance and Repair Services
Term Contract
Post-Bid
Denver, CO 80223

Aspen Maintenance Facility Phase 9 Fuel Tank Replacement
Results
Aspen, CO 81611

Cde Ten Well Plugging Project
Post-Bid
Denver, CO

Fuel Island Expansion for LPG Autogas
Results
Thornton, CO 80240

Romo Temporary Fuel Tank Hookup
Post-Bid
Estes Park, CO 80517

Livermore Fuel Site Tank Relocation
Results
$100,000 to $150,000 est. value
Livermore, CO 80521

Lease and Installation of a Liquid Oxygen System
Post-Bid
Grand Junction, CO 81501

Lng Fuel Supply and Site Maintenance
Results
Greeley, CO

Fuel System Installation at the Frisco Bay Marina
Post-Bid
Frisco, CO 80443

Last Updated 05/29/2021 02:38 AM
Project Title

Granda Bulk Fuel Tank

Physical Address View project details and contacts
City, State (County) Granada, CO 81041   (Prowers County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of this specification to describe the quality of an 10,000 gallon UL 2085 above ground bulk storage tank to be delivered to and unloaded at CDOT facility near Granada, CO. Materials used shall be at least at minimum standard as specified and of a quality used for commercial bulk fuel storage, conforming to current engineering and manufacturing practices, and in compliance with NFPA, and the Colorado Division of Oil and Public Safety regulations. All components of the above ground storage tank shall be of proper design to safely withstand maximum stresses imposed under normal CDOT use. Any attachments, accessories, tools, or other components normally furnished as standard equipment and, or necessary for the safe and efficient operation of the storage and dispensing of fuel shall be furnished. The proposal will include the cost to deliver, unload, and place the storage tank in a specific location determined by CDOT. Due to possible winter conditions at Granada, CDOT shall be given a minimum of two week’s prior notice before delivery of the storage tank to prepare area for safe delivery, unloading and installation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents