Similar Projects
Coconino Estates Phase II Improvements
Bidding
Flagstaff, AZ

Palm Lane Storm Drain: 28th Place to 32nd Street - Design-Bid-Build
Bidding
Phoenix, AZ

Storm Drain Catch Basins
Term Contract
Post-Bid
AZ

Fairway Oaks/Chaparral Sewer
Post-Bid
Sedona, AZ

Y--Haekel Rd San Simon Crossing Culvert
Results
$1,000,000 to $1,500,000 est. value
Safford, AZ

M--La Posa Box Culvert and LWC Design / Construction
Results
Quartzsite, AZ 85346

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Pecos Parcel - Water and Sewer
Construction
$51,000 est. value
Chandler, AZ 85226

Bethany Home Road Storm Drain 43rd Avenue to 51st Avenue
Bidding
$10,000,000 est. value
Glendale, AZ

Prison Hill Siphon
Post-Bid
Yuma, AZ

Rancho Los Oros Roadway Improvements
Results
Less than $520,000 est. value
San Luis, AZ 85349

128th Street Box Culvert Construction Project
Construction
Scottsdale, AZ 85255

Water Distribution System Replacement
Renovation
Post-Bid
$500,000 est. value
Tucson, AZ 85750

Stormwater Infrastructure and Drywell Cleaning, Maintenance and Repair
Term Contract
Results
Tempe, AZ 85280

Landfill Gas, Groundwater and Storm Water Systems Installation, Maintenance, Parts and Service
Term Contract
Results
Glendale, AZ 85301

Reported 01/04/2020 12:00 AM
Project Title

Northside Canal Siphon Inspection Rehabilitation and Lining Project

Physical Address View project details and contacts
City, State (County) Coolidge, AZ   (Pinal County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment, transportation, and services for the assessment of the structural integrity of the Northside Siphon. The existing Northside Siphon which is appurtenant to the Northside Canal includes approximately ~1640 feet of an existing 36" concrete siphon. Work for the canal and siphon includes, but is not limited to, coordination with the Owner (SCIDD); coordination with the San Carlos Irrigation Project (SCIP); all necessary field work; submittal of a access plan; dewatering plan and procedures including any necessary cleaning; confined space safety plan; manned visual inspection; sounding inspection; CCTV inspection; electroscan survey; and draft and Final Assessment Reports.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents