Similar Projects
Big Creek Greenway Phase 2 Rehab
Infrastructure
Bidding
Cumming, GA

Enota Stormwater Project
Infrastructure
Bidding
Dahlonega, GA 30533

Painting Projects for Multiple Facilities
Post-Bid
Tyrone, GA 30290

South Cobb High school Gym Floor Replacement
Post-Bid
Austell, GA 30106

45--Provide Boiler Burner W/Installation. Remove Existing Defective Burner From #3 Boiler Supply And Install New Webster Natural Gas And #2 Fuel Oil Fired Burner, Model Hds5c-150B.
Results
Augusta, GA 30904

Lou Walker Senior Center ADA Improvements
Results
Decatur, GA 30058

Honest Alley Parking and Dumpster Enclosure Project
Infrastructure
Bidding
Lawrenceville, GA

78--Gym Flooring
Post-Bid
Savannah, GA 31409

Xpress West Douglas and Panola Park and Ride Lot Granite and Concrete Repair Work
Results
Stockbridge, GA 30281

RTU 1 and 2 Replacement-Building 700
Alteration
Bidding
Lawrenceville, GA 30043

HVAC Services and Equipment Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

F and O Offices HVAC Renovation
Results
Lawrenceville, GA 30045

Door Hardware Installation Services
Alteration
Bidding
Kennesaw, Marietta, GA 30144

Strip and Reseal Two Gymnasium Floors and One Danc
Post-Bid
Cumming, GA 30040

Construction - Athens, USDA-NRCS Renovate Office Interior
Renovation
Results
$100,000 to $250,000 est. value
Athens, GA 30601

Reported 09/23/2021 12:00 AM
Project Title

Selective Improvements at Four Developments

Physical Address View project details and contacts
City, State (County) Metter, GA   (Candler County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Finishes/Interior, Flooring, HVAC, Painting, Plumbing, Sidewalks/Parking Lot, Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Scope Of Work consist of Parking Area Expansion at Four (4) locations in GA189001, Mail Station Replacement and UpGrade at Ten (10) locations in GA189001, GA189002, GA189003 & GA189004, and Exterior Frame and Door Replacement at Sixteen (16) Apartments in GA189003. In Development GA189003 Three (3) Apartments are planned to receive Selective Interior Improvements consisting of VCT/Asbestos Floor Tile abatement, VCT Flooring, Walls and Ceiling Sheetrock Overlay, Interior Millwork, Interior Frame and Door Replacement, Interior Painting and Finishes, Cabinetry Replacement, Bathroom UpGrades, Plumbing Fixture UpGrades, HVAC Grille Replacement, Electrical Devices and Plates Replacement, and Light Fixture Replacement.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents