Similar Projects
Harbor Place - Phase 2 - Office Building
New Construction - 66,000 SF
Conception
$20,302,838 est. value
Erie, PA 156550

Harbor Place - Phase 8b - Mixed Use/Commercial
New Construction - 40,000 SF
Conception
$10,000,000 est. value
Erie, PA 16550

New Hanover Town Center
New Construction - 332,100 SF
Design
$320,000,000 est. value
Gilbertsville, PA 19525

Germantown Avenue Development
New Construction - 24,113 SF
Design
$5,000,000 est. value
Philadelphia, PA 19144

AutoZone #1300
New Construction - 7,147 SF
Bidding
$500,000 to $1,000,000 est. value
Bala Cynwyd, PA 19004

650 Fairmount
New Construction - 21,000 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Philadelphia, PA 19123

Big Tom's Barbershop
Renovation - 4,885 SF
Sub-Bidding
$250,000 est. value
Pittsburgh, PA 15219

Washington Avenue Development
Renovation - 7,200 SF
Post-Bid
$850,000 est. value
Downingtown, PA 19335

Walmart Supercenter #2480-603 - Capx-Combo
Renovation
Post-Bid
Honesdale, PA 18431

Redevelopment of Strip District Produce Terminal
Renovation - 55,000 SF
Construction
$13,636,000 est. value
Pittsburgh, PA 15222

Penn State Hillel Student Center
New Construction - 48,000 SF
Construction
$12,000,000 to $15,000,000 est. value
State College, PA 16801

Commercial Auto Parts Warehouses
New Construction - 14,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Gettysburg, PA 17325

The Cecil
New Construction
Pending Verification
Philadelphia, PA 19122

Penn's Landing Master Plan
New Construction - 3,500,000 SF
Conception
$2,200,000,000 est. value
Philadelphia, PA 19107

Pocono Springs Entertainment Village
New Construction
Design
$350,000,000 est. value
Tobyhanna, PA 18466

Reported 10/07/2021 12:00 AM
Project Title

Susquehanna Union Green Core Building 4

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17110   (Dauphin County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected January 2022, Construction Completion Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Core & Shell Building with Tenant Fit-Out for a new building.

Details

Retail, 9,200 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents