Similar Projects
Airport Landside Terminal Parking Lot - City of Auburn
Infrastructure
Conception
$250,000 CJ est. value
Auburn, ME 04210

Airport Landside Terminal Parking Lot - City of Auburn
Infrastructure
Conception
$250,000 CJ est. value
Auburn, ME 04210

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Ferry Road Roadway Improvements
Infrastructure
Post-Bid
$430,000 est. value
Lisbon, ME 04250

Hot Mix Shimming and Surface Paving
Infrastructure
Post-Bid
$250,000 est. value
Turner, ME

Intersection Improvements
Results
Auburn, ME 04210

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Construct Corporate Hangar - City of Auburn
New Construction, Infrastructure
Conception
$975,000 CJ est. value
Auburn, ME 04210

Brickyard Commons - Auburn
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Auburn, ME 04210

2023 Street Rehabilitation and Resurfacing
Infrastructure
Bidding
$1,150,000 CJ est. value
Lewiston, ME 04240

Last Updated 03/13/2023 01:09 PM
Project Title

Champlain Avenue Water Main Replacement

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $555,729 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

14-208-23 Questions and Requests for Information shall be submitted to Faith Thomas (fthomas@lewistonmaine.gov) on or before noon, February 14, 2023 The work for the CHAMPLAIN AVENUE WATER MAIN REPLACEMENT shall consist of, but not be limited to, the complete and satisfactory construction of installation of: -1,800 LF of 6" Dia. DI Water Main -660 LF of 3/4 " Copper Water Services -530 CY Aggregate Base (MDOT 703.06 Type A) -850 CY Aggregate Subbase (MDOT 703.06 Type D) -540 Ton of 12.5mm HMA Surface Course -720 Ton of 19mm HMA Base Course -6,300 SY of Pavement Removal Work will include the installation of a new water main and services within the entirety of Champlain Avenue, and ~180-ft of water main in Surry Lane, as indicated on the bid plans. The existing pavement within Champlain Avenue & Surry Lane will need to be removed and repaved with base & finish surfaces to the full street width. Temporary water services during construction will be required during new main installation. Coordination with the Water District for requisite shut-downs will be required No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of five percent (5%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents