Similar Projects
Concrete Membrane - Lagoon - City of Orem
Renovation, Infrastructure
Conception
$718,233 CJ est. value
Orem, UT 84058

RFQ Contractor - Rainbow Cove Campground Improvements - Bear Lake State Park
Infrastructure
Bidding
$3,500,000 CJ est. value
Laketown, UT 84038

Fairview City - Effluent Water Reuse Project - Water Storage Tank
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Fairview, UT 84629

Water Reclamation Facility 2021 Upgrades Project
Renovation
Post-Bid
Tooele, UT

Wastewater Treatment Plant Expansion Construction Management/General Contractor Services
New Construction
Post-Bid
$23,000,000 est. value
Payson, UT 84651

New Water Reclamation Facility
Results
Less than $80,000,000 est. value
Spanish Fork, UT

Final Effluent Pipeline Project
Results
Syracuse, UT

Provo City Wastewater Treatment Plant Misc. Improvements
Renovation
Construction
$500,000 CJ est. value
Provo, UT 84601

Salt Lake City Department of Public Utilities (SLCDPU) - New Water Reclamation Facility (WRF) Project Liquid Train - Package 2
New Construction, Infrastructure
Pending Verification
$600,000,000 CJ est. value
Salt Lake City, UT 84111

CWP Groundwater Polishing Plant - Pressure Filter Vessels
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Orem, UT 84057

New Water Reclamation Facility Project SW-2 Standby Power and Susbstation
New Construction, Infrastructure, Alteration
Post-Bid
Salt Lake City, UT 84116

Construction of the Water Treatment Plant Chain and Flight and Wastewater Treatment Plant Nutrient Upgrades Project
New Construction
Results
Price, UT

New Water Reclamation Facility (WRF) - SW1 Influent Pump Station
Renovation
Post-Bid
Salt Lake City, UT

Installation of Primary Clarifier 3 Launder, Weirs, Baffles, and Scum Box
New Construction
Results
Syracuse, UT

Water Treatment System Rehabilitation Project on the Ashley National Forest
Renovation
Post-Bid
$250,000 CJ est. value
Red Canyon, UT 84023

Last Updated 11/16/2022 05:33 PM
Project Title

Boiler Replacement Project at Jordan Valley Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $608,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work described in these bid documents entails the supply of two boilers, to the Jordan Valley Water Treatment Plant (JVWTP). Each bid shall be accompanied by a certified or cashier's check, money order or bid bond in the amount of five percent of the total bid price payable to the Jordan Valley Water Conservancy District as a guarantee that the bidder, if its bid is accepted, will promptly execute the contract, provide evidence of worker's compensation insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price. This work is expected to be completed under state COVID-19 work restrictions. Supplier is to require that all personal working on this project be healthy each workday and that those persons who might be ill are not allowed to work at District facilities. Supplier is to take other precautions as required by Salt Lake County Health officials. The envelope shall be plainly marked in the upper left-hand corner with the name and address of the bidder and shall bear the words "Bid for," followed by the title of the Contract Documents for the work and the date and hour of opening of bids. All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project. It shall be understood, however, that no interpretations of the specifications will be made by telephone, nor will any "or equal" products be considered for approval prior to award of contract. Engineer Heath Engineering 377 West 800 North Salt Lake City, Utah 84103 (801)322-0487 heath@heatheng.com Project Manager: Robert Kesler, PE 801-597-3619 rkesler@heatheng.com The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. AWARD OF CONTRACT: An Award of Contract, if it were awarded, will be made within 60 calendar days of the opening of bids. NOTICE TO PROCEED: A Notice to Proceed, if it were issued, will be made within 60 calendar days of the Notice of Award. COMPLETION OF WORK: All work shall be completed within 48 calendar days from the date of the Notice to Proceed. This deadline does not apply to long lead items, such as pumps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents