Similar Projects
GA ERFO NPS CUIS 2017-1(1)
Results
$1,000,000 to $5,000,000 est. value
Saint Marys, GA

Savannah Boathouse
New Construction
Construction
Savannah, GA 31410

Cherokee Mills Boat Ramp Repairs
Results
Woodstock, GA 30189

Dry Docking and Repair of the Research Vessel Savannah 2021
Post-Bid
Athens, GA

Labor to Construct Deck
Post-Bid
Bainbridge, GA 31717

South River Trail Boardwalk Repair
Results
Decatur, GA 30030

Riverside Parkway At Sweetwater Creek Bridge Rehabilitation
Results
Douglasville, GA

Floating Dock and Gangway Repair/Replacement - Brushy Branch Park
Results
Rome, GA 30165

Zonolite Park Boardwalk
Results
Atlanta, GA 30306

Providence Park Improvements
New Construction - 635 SF
Post-Bid
Milton, GA 30009

Wells Creek Bridge and ST. Simons Island Fishing Pier Rehabilitation 2021
Results
Saint Simons, GA

Purchase and Installation of Aluminum Piers
Results
Lawrenceville, GA 30045

Floating Kayak Dock
Results
Less than $25,893 est. value
Hiawassee, GA 30546

Last Updated 05/10/2021 10:42 AM
Project Title

Dock Refurbishments at the East River Terminal

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31520   (Glynn County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of extending the reinforced concrete deck overlay South throughout Shed 2 and raising required access doors. The overlay will also extend east to the two exiting hoppers with their foundation reconstructed and ramps constructed transitioning to the existing surface. The Valve Room man doors are to be removed and sealed with CMU block and the existing support columns shall be encased in concrete. Existing compromised concrete piles shall be repaired with Prefabricated Fiber Reinforced Polymer (FRP) pile jackets and filled with grout. Reinforcing steel shall be added to maintain structural integrity of the compromised piles. Additionally, vertical dowels are proposed to be drilled/post installed into the existing deck and capitals at select piles. The project is located at the East River Terminal, Brunswick, Georgia.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents