Similar Projects
Pineda Crossing 16" Water Main - Phase II - CP-UT-20-PC - City of Cocoa
Infrastructure
Conception
$11,060,500 CJ est. value
Cocoa, FL 32922

14"/18" AC Raw Water Pipeline Upgrade and Well 17 Area Isolation Valves - Phase I Construction - CP-UT-21-IV - City of Cocoa
Infrastructure
Conception
$2,367,024 CJ est. value
Cocoa, FL 32922

Mosswood Townhomes Subdivision
New Construction, Infrastructure
Design
$15,652,160 CJ est. value
Melbourne, FL 32935

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Reverse Osmosis Water Treatment Plant Disposal Well
Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Melbourne, FL 32901

Marina Dock Repairs FY23
Infrastructure
Bidding
$500,000 CJ est. value
Titusville, FL 32796

Starbucks / Melbourne
Demolition, New Construction, Infrastructure - 2,503 SF
Post-Bid
$762,000 CJ est. value
Melbourne, FL 32901

Land Clearing Management
Term Contract, Infrastructure
Post-Bid
Melbourne, FL

S-96 Rehabilitation
Renovation
Results
$2,784,130 est. value
FL

Wetland Outfall Weirs and Valves
Infrastructure
Results
Melbourne, FL 32940

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

The Church of JCLDS Parking Lot Addition
Addition
Construction
$247,000 est. value
Melbourne, FL

Eau Gallie Office Park, Phase 6 - Makoto's Addition
Addition, Demolition, Renovation, Infrastructure - 3,913 SF
Pending Verification
$1,000,000 CJ est. value
Melbourne, FL 32934

SpaceX Operations Area / Kennedy Space Center
New Construction, Infrastructure - 480,000 SF
Pending Verification
$258,000,000 CJ est. value
Titusville, FL 32780

Commodore Boulevard Widening - 64119 - City of Melbourne
Infrastructure
Conception
$2,250,000 CJ est. value
Melbourne, FL 32935

Last Updated 12/30/2022 01:04 PM
Project Title

Eau Gallie River Water Control Dam Replacement

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32901   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,261,250 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

his project includes partial demolition and replacement of the existing sheet pile water control dam on the Eau Gallie River. New water control dam to consist of steel sheet piles treated with coal tar epoxy, concrete cap, spillover concrete channel, concrete filled burlap bag scour protection and signage. Construction to be completed in very specific sequenced controlled phases to allow continued control of water flow through/over the existing and proposed dam structures. Project will also involve restoration of natural areas damaged by construction activities. Access to site is limited, refer to civil/site plans for access limitations. The work includes furnishing all material, labor, and equipment necessary for constructing EAU GALLIE RIVER WATER CONTROL DAM REPLACEMENT. All work is to be done in accordance to the plans and specifications of Project No. 20412., 21-0524 004, 517023 City of Melbourne, Florida, reserves the right to reject any and all bids

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents