Similar Projects
Cobb 192 - Self-Storage Facility
New Construction - 91,476 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Melbourne, FL

Lockheed Martin
New Construction, Renovation - 95,000 SF
Design
Titusville, FL 32780

Custom Industrial Products Warehouse
Addition - 20,000 SF
Design
Melbourne, FL

Brevard Public Schools 520 Bus Compound
Post-Bid
Viera, FL 32940

Design-Build Hangar C, Office Improvements
Renovation
Post-Bid
Sebastian, FL

Chemical Pole Storage Building at Surface Water Treatment Plant
New Construction
Results
$200,000 est. value
Melbourne, FL 32934

San Filippo Apartments
New Construction - 258,562 SF
Construction
Palm Bay, FL 32909

Integra Trails Apartment Complex
New Construction - 307,416 SF
Construction
Cocoa, FL 32922

U-Haul Self-Storage and Warehouse
New Construction - 60,395 SF
Design
Titusville, FL

International Corporate Park Warehouse
New Construction - 220,813 SF
Post-Bid
Orlando, FL 32832

Bragg Companies Florida Headquarters
New Construction - 14,095 SF
Construction
$2,002,000 est. value
Titusville, FL 32780

Wickham Mini Self-Storage
New Construction - 86,430 SF
Design
Melbourne, FL

JP Donovan Office-Warehouse Expansion
Renovation, Addition - 20,550 SF
Construction
$1,800,000 est. value
Rockledge, FL 32955

CHW Warehouse
New Construction - 21,296 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Melbourne, FL 32904

Brevard County Traffic Operations Center Renovations
New Construction, Renovation
Construction
$2,934,605 est. value
Melbourne, FL 32940

Last Updated 03/17/2022 01:49 PM
Project Title

Furnish and Install Three-(3) Carport Structures - Water Reclamation

Physical Address View project details and contacts
City, State (County) Titusville, FL 32780   (Brevard County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide all labor, material and equipment to install three-(3) carport structures at the City’s Blue Heron Water Reclamation Facility located at 4800 Deep Marsh Road, Titusville, FL 32780. To provide all labor, materials, equipment, and supervision. • One-(1) Carport Structure, 24’ W x 26’ L x 12’ H, galvanized steel frame, vertical roof on an existing concrete slab, white roof panels • One-(1) Carport Structure, 15’ W x 41’ L x 15’ H, galvanized steel frame, vertical roof on an existing concrete slab, white roof panels • One-(1) Carport Structure, 15’ W x 41’ L x 15’ H, galvanized steel frame, vertical roof with one- (1) side (length-wise) mounted on asphalt and the other side mounted on concrete, white roof panels

Details

Warehouse/Storage, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents