Similar Projects
Last Updated | 09/20/2022 05:31 AM |
Project Title | Construction of the Bountiful/woods Cross 5th South PCE Plume NPL Site Operable Unit 2 Soil Vapor Extraction System |
Physical Address | View project details and contacts |
City, State (County) | Bountiful, UT 84010 (Davis County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $720,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Proposals are sought for the construction of the remedial action consisting of construction of the source area remediation via soil vapor extraction for the Bountiful/Woods Cross 5th South PCE Plume Site located in Davis County, Utah. Contact information for property owners is included in the Special Terms and Conditions as Exhibit C. The remedial action is to be completed in accordance with this RFP, and any Addenda issued prior to receipt of proposals. A complete description of Work is set forth in this RFP. The Offeror attention is specifically directed to the Remedial Action Drawings and the Technical Specifications included in Attachment C (Scope of Work). This entire RFP must be reviewed for a complete description of the project and its requirements. Cost proposals must include all expenses necessary to complete the Work. Any prospective bidders who arrive late to the meeting will not be allowed to continue with the site visit nor submit a bid. Failure to attend the site visit shall result in the disqualification of any bidder that does not have an authorized representative attend the entire duration of the mandatory site visit. This includes not taking calls/text during the site visit. Phones may be used to take pictures. All discussion not related to the site visit must be done after the site visit as to not be a disturbance during the site visit. An attendance log will be maintained including the name of each attendee, the entity the attendee is representing, and the attendee contact information, minutes of the site visit, and copies of any documents distributed by the conducting procurement unit to the attendees and shall be published as an addendum to the solicitation. Any verbal modifications made to any of the solicitation documents during the mandatory site visit shall be reduced to writing and will be published as an addendum to the solicitation. Question Submission Close Date 9/9/2022 2:00 PM MDT A bid bond properly signed by the contractor and a qualified surety in the amount of five percent (5%) of the bid (proposal) amount, made payable to the Department of Environmental Quality performance bond satisfactory to the procurement unit that is in an amount equal to 100% of the price specified in the contract and is executed by a surety company authorized to do business in the state or any other form satisfactory to the procurement uni payment bond satisfactory to the procurement unit that is in an amount equal to 100% of the price specified in the contract and is executed by a surety company authorized to do business in the state or any other form satisfactory to the procurement unit, which is for the protection of each person supplying labor, service, equipment, or material for the performance of the work provided for in the contract. The Contract Documents require the Contractor to complete the Work in 180 calendar days from Notice to Proceed |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |