Similar Projects
Last Updated | 03/03/2020 11:59 AM |
Project Title | Billings Road Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Hermon, ME (Penobscot County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reconstruction of portions of the Billings Road in Hermon, Maine. The work generally consists of the following, which is not an all-inclusive list: A pavement overlay project consisting of a 1 ΒΌ inch Hot Mix Asphalt overlay (with shim) of existing pavement on Billings Road, beginning at the intersection Fuller road and extending northerly 1.5 miles, then full depth reclamation of existing pavement with a pavement overlay for an additional distance of 0.30 miles to Route 222, for a total project length of 1.80 miles. Work also to include replacement of ten roadway cross culverts, field-selected driveway culverts, ditch cleaning, limited ditch reconstruction and tree removal. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |