Similar Projects
Water Plant Number 6
New Construction
Bidding
TX

2021 Water Plant No 2 Improvements
Renovation
Bidding
TX

Construction of Water Plant No. 1 MCC Replacement and SCADA System
New Construction
Post-Bid
Houston, TX 77014

Water Plant Improvements 2021
Renovation
Post-Bid
$150,000 est. value
Houston, TX 77090

Manvel Town Center Water Plant
Results
Houston, TX

Water Plant No. 1 & No. 2 Ion Exchange Conversion Pilot Study
Results
TX

Water Plant No. 2 Expansion
Addition
Bidding
TX

Water Plant No. 1 Rehabilitation
Results
TX

Water Plant No. 2
Results
Houston, TX 77002

Water Plant No. 1 and No. 2 Improvements
Results
TX

Construction of Sanitary Sewer Rehabilitation Eagle Springs Water Plant PLC Addition
Addition
Results
TX

EWPP - Replacement Of Scrubbers
Results
Less than $3,368,680 est. value
Houston, TX

Construction of Water Plant No. 1 Rebuild and Water Plant No. 3 Expansion
Results
$5,450,000 est. value
Houston, TX 77084

Construction of Remote Water Well and Water Plant No. 2 Expansion
Results
$2,991,000 est. value
Humble, TX 77396

Repair and Repainting of the Ground Storage Tank at Water Plant No. 2
Results
Less than $350,000 est. value
Bunker Hill Village, TX

Last Updated 01/21/2022 09:52 AM
Project Title

East Water Purification Plant Chlorine System Improvements - Package 2

Physical Address View project details and contacts
City, State (County) Houston, TX 77015   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $24,810,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes the following: Ton Container Building improvements, demolition and installation of new Evaporators including all associated piping and appurtenances, demolition and installation of new Chlorinators including all associated piping and appurtenances, demolition and installation of new Reverse Osmosis Units, demolition and installation of new CPVC piping from Evaporators to Ejector Stations, demolition and installation of new CPVC piping from Ejector Stations to Injection Points, Electrical, Instrumentation and PLC improvements, installation of temporary Sodium Hypochlorite System.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents