Similar Projects
Brookline Direct Part 1 - City of Republic
New Construction
Conception
$6,000,000 est. value
Republic, MO

Grit Removal Improvements - Rock Creek Pump Station - 302401 - City of Independence
Renovation
Conception
$750,000 CJ est. value
Independence, MO 64050

Spring Lakes #1 Lift Station Improvements
Infrastructure, Renovation
Bidding
$800,000 CJ est. value
Cottleville, MO 63366

Pere Cliff Plant Removal and Lift Station Improvements
Infrastructure
Bidding
$430,000 CJ est. value
Fenton, MO 63026

North Union Street Sanitary Sewer and Lift Station and North Industrial Park Sanitary Sewer Extension
Infrastructure
Post-Bid
Jackson, MO 63755

11th Plat Pump Station Repairs 2021
New Construction
Post-Bid
Kansas City, MO

FF Highway Pump Station Retrofit
New Construction
Results
Parkville, MO

Raw Water Pump Station, Value Vault and Zebra Mussel Control
Renovation
Results
Smithville, MO

Olive and Orchard (Local Road reconstruction and Stormwater) - 94532272 - City of Lees Summit
Infrastructure
Conception
$3,550,000 CJ est. value
Lees Summit, MO 64063

Water Interconnect Booster Pump Station
Renovation
Bidding
$260,000 CJ est. value
Saint Peters, MO 63376

Pump Station
New Construction
Post-Bid
California, MO

15th Street Pump Station Upgrade and Sewer Separation
Demolition
Results
Kansas City, MO

Tudor Road Pump Station Force Main Drain Line - 97231783 - City of Lees Summit
Infrastructure
Conception
$550,000 CJ est. value
Lees Summit, MO 64063

Rock Creek Pump Station Stairs Upgrade and Railing Repairs / Sugar Creek Pump Station Railing Repairs
Renovation
Bidding
$300,000 CJ est. value
Independence, MO 64050

Pelham and Central Regional Lift Station
New Construction
Post-Bid
Sedalia, MO

Last Updated 09/15/2022 03:02 AM
Project Title

Grit Removal Improvements - Sugar Creek Pump Station - 302405 - City of Independence

Physical Address View project details and contacts
City, State (County) Independence, MO 64050   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Process will further improve pre-treatment operations at the Sugar Creek Pump Station. This pump station manages approximately 40 percent of the waste stream for the Rock Creek Treatment Plant. Grit removal from the sanitary sewer waste stream improves pump station and treatment plant efficiencies. Removal at the pump stations instead of later in the treatment process will keep from additional power required to pump this material for later processing. As September 15, 2022, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY '23/'24. A firm timeline has not been established; however, construction is scheduled for Fiscal Year '23/'24. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents