Similar Projects
Alternate Aviation Ground Power Unit (AGPU) Generator
Post-Bid
Atlanta, GA

Fire Station No.4 Solar Energy System
Post-Bid
Less than $99,000 est. value
Athens, GA 30606

Mechanical Electrical IDIQ
Results
$500,000 to $1,000,000 est. value
Robins Afb, GA 31098

Three Phase Pad Mounted Transformers
Results
Covington, GA 30014

Installation Project for Gen-Set at City Hall
Post-Bid
Bainbridge, GA 39817

Scott Candler Water Treatment Plant - Ozone Generators Design and Installation
Results
Doraville, GA 30360

Electric Motor Repair and Replacement Service
Post-Bid
GA

Paulson Stadium LED Conversion
Results
Statesboro, GA 30460

Cathodic Protection Ground Beds and One Cathodic Protection Rectifier
Post-Bid
Bainbridge, GA 39818

30KW 120/208 3PH Generac Generator
Term Contract
Results
Less than $71,680 est. value
Sylvester, GA 31791

Install of 4 New Generac Generators
Post-Bid
GA

Deuce Lloyd Park Lighting
Results
Less than $12,900 est. value
Folkston, GA 31537

Low Voltage at Public Defender/District Attorney Building
Post-Bid
Forsyth, GA 31029

Midtown Atlanta Regional Activity Center - Pedestrian Mobility
Results
Atlanta, GA 30303

Ft Benning Electrical Distribution
Post-Bid
Fort Benning, GA 31905

Reported 12/08/2021 12:00 AM
Project Title

F. Wayne Hill Water Resources Center Ozone Electrical Upgrade

Physical Address View project details and contacts
City, State (County) GA   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The principal work to be performed involves the demolition and replacement of the Post-Ozonation Low Voltage Motor Control Centers (MCC) 35:MCC-21 & 35-MCC-22 and upstream feeders; retrofitting of new feeder breakers and vertical bus within the Effluent Pump Station Low Voltage Switchgear 37:MCC-37A & 37:MCC- 37B, at the F. Wayne Hill Water Resources Center. Project testing to include mandrel testing upon existing conduits and lateral raceway, Megger testing on existing power wiring, and acceptance testing on newly installed electrical equipment. All power wiring and connections as indicated on the drawings or as required for the proper operation of all electrically operated equipment, Electrical Arc Flash Analysis, Short-Circuit and Coordination Study are to be provided. Work also includes the communication network connection and System Integration of MCC intelligent devices to the facility SCADA system.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents