Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Install Cured In Place Pipe Lining in Second Floor Sewer Piping, Federal Building/PO/CH
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Pierre, SD 57501

Underground Infrastructure Inspection
Infrastructure
Post-Bid

RFP Design - Architectural and Engineering Services Grounds ,Stormwater,Water Line,Sewer
Infrastructure
Post-Bid
$3,200,000 CJ est. value
Pierre, SD 57501

2022 Pipe, Valves, Fittings and Hydrants
Infrastructure
Results
Pierre, SD

Black Hills Drive Extension
Infrastructure
Results
$500,000 est. value
SD

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

T.F. Riggs High School Athletics Addition - Pierre School District
Addition, Demolition, Infrastructure
Pending Verification
$9,300,000 CJ est. value
Pierre, SD 57501

OAHA YMCA Phase 2 Addition
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$500,000 CJ est. value
Pierre, SD 57501

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

RFP Engineering - A and E Services Hill, Water Replacement Penitentiary
Infrastructure
Post-Bid
$500,000 CJ est. value
Pierre, SD 57501

Access Area Construction, Whitewood Lake Access Area
Infrastructure
Results
$400,000 est. value
Pierre, SD

Last Updated 02/14/2023 02:12 AM
Project Title

2024 Areawide Pipe Work Projects

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $710,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Various Locations Throughout the Pierre Area Length 18.1 As of February 14, 2023, the project is in Design status. Anticipated Construction year is 2024. SDDOT - 2024 Areawide Pipe Work Projects *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents