Project Title | 2023 Sanitary Sewer Grouting Program |
Physical Address | View project details and contacts |
City, State (County) | Bloomingdale, IL 60108 (DuPage County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $48,530 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DESCRIPTION OF WORK The proposed improvement consists of testing and sealing 49- (6'') sanitary sewer service laterals of varying pipe material at the mainline lateral interface and up to 3 feet from the mainline including cutting protruding laterals as necessary. All bidders shall certify that they have successfully grouted a minimum of 12,000 mainline joints and 1,000 lateral connections and are an approved installer of the grout product by the manufacturer. PREVAILING WAGES The successful Contractor shall comply with the Illinois Prevailing Wage Act requirements (820 ILCS 130/1-12) for this contract including submission of certified payroll requirements and the employment of Illinois workers during periods of excessive unemployment. BID SECURITY All Proposals must be accompanied by a Bank Cashier's Check, Bank Draft, Certified Check or Bidder's Bond, made payable to the Treasurer of the Village of Bloomingdale, for not less than five (5) percent of the total bid. REJECTION OF BIDS The President and Board of Trustees reserve the right to reject any and all proposals and to waive any and all technicalities. All questions shall be directed to Ken Lindhorn, Utilities Distribution Supervisor, at 630-671-5833. The Work shall consist of the following procedures which may be required depending on field conditions. It is intended that a minimal number of the procedures be used to accomplish the work. High Velocity Hydro-Jetting/Vacuum Cleaning, Closed Circuit Television Inspection. Root/Grease Cutting of Main and / or Lateral. Cutting of Protruding Laterals. Lateral Air Pressure Testing and Sealing. Materials. Warranty |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |