Similar Projects
20D: Kent Booster Pump Station Project
New Construction
Bidding
$10,000,000 est. value
West Valley City, UT 84120

DFCM Construction Pre-qualified General UDC Central Utah Correctional Facility (CUCF) Pump House Water and Sewer Improvements
Renovation
Bidding
$1,700,000 est. value
Gunnison, UT 84634

Booster Pump Station #2 Rehabilitation
Post-Bid
Ogden, UT 84310

Booster Pump Station #3 Rehabilitation
Post-Bid
Ogden, UT 84310

Pump Replacement for JBM Pump Station
Results
Less than $198,844 est. value
Herriman, UT

SLC WRF Influent Pump Rebuild Project
Results
Less than $369,000 est. value
Salt Lake City, UT

City Creek Pump Station and Pipeline
Construction
Saint George, UT

Public Works SCADA System Upgrade 2021
Post-Bid
$385,000 est. value
Lindon, UT

Industrial Sewer and Lift Station Abandonment
Results
Less than $1,811,150 est. value
Provo, UT

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

UDOT Hot Springs MS4 (Willard)
Demolition
Results
Willard, UT 84340

1500 East Force Main Improvements Project
Renovation
Post-Bid
Vernal, UT

River Oaks Pump Station
Results
Sandy, UT

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Post-Bid
Santaquin, UT 84655

Southwest Lift Station
Results
Provo, UT

Last Updated 06/07/2022 04:48 PM
Project Title

2022 Channel Grinder Replacements

Physical Address View project details and contacts
City, State (County) Salt Lake City, West Valley City, UT 84119   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The channel grinders for wastewater pumping stations. GHID currently operates and maintains Muffin Monster Channel Grinders at most of the District’s wastewater pumping stations. GHID has a replacement program in place for these channel grinders to be replaced every 5 years. For the year 2022, GHID has 3 channel grinders that are scheduled for replacement.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents