Similar Projects
Sixth and Walnut Street CDBG Sidewalk Improvement Project
Post-Bid
Chelsea, MA 02150

Construction of Concrete Sidewalks and Resetting of Granite Curbing in Varous Locations
Post-Bid
Winthrop, MA

Parking Lot Repair at the BCYF Roche Family Community Center
Results
Less than $50,000 est. value
West Roxbury, MA 02132

Restoration of Sidewalk Excavations Citywide
Results
Less than $725,000 est. value
Boston, MA

Construction Services - Drainage, Sidewalks and Roadways
New Construction
Construction
$2,268,000 est. value
Boston, MA

Sidewalk Improvements
Post-Bid
Revere, MA 02151

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

ADA Sidewalk Ramp Replacement Project
Post-Bid
Chelsea, MA 02150

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $2,395,000 est. value

Tripping Hazards at Various Federal Elderly Developments
Post-Bid
Less than $2,300,000 est. value
Boston, MA

Pedestrian Ramp Reconstruction and Sidewalk
Results
$2,152,800 est. value
Boston, MA

Carter Street Bicycle and Pedestrian Improvements
Post-Bid
Chelsea, MA 02150

Small Repairs - Streets and Sidewalks
Results
Less than $500,000 est. value
Revere, MA

Tripping Hazards at Various Federal Family Developments
Post-Bid
$7,324,000 est. value
Jamaica Plain, MA 02130

Sidewalk Repairs on Various Streets, Including Pedestrian Ramps Upgrades
Results
$1,250,000 est. value
Boston, MA 02201

Last Updated 08/26/2020 09:12 AM
Project Title

Curley K-8 Exterior Walkway - General Bids

Physical Address View project details and contacts
City, State (County) Boston, Jamaica Plain, MA 02130   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,879,927
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certified The scope of work is further detailed in the specifications and consists of demolition of existing bridge and walkway; construction of new ramp, stairs, and bridge to the second floor of the school building. Modifications of exiting boys’ room to include accessible toilet with separate entrance.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents