Similar Projects
22924 Sussex Car Wash
New Construction, Infrastructure, Alteration - 3,750 SF
Design
$980,000 est. value
Seaford, DE 19973

SR 8 and SR 15 - Intersection Improvements
Infrastructure
Bidding
$5,960,213 est. value
Dover, DE 19904

FY2023 Street Paving Project
Infrastructure
Bidding
$200,000 est. value
Rehoboth Beach, DE 19971

Paving
Term Contract
Post-Bid
DE

MATOC - Concrete Repair and Asphalt Paving
Term Contract, Alteration
Post-Bid
$100,000 to $250,000 est. value
New Castle, DE 19720

BR 3-155N and S on SR1 Over Broadkill River
Results
DE

Pavement Preservation, Open End, Sussex/Kent, FY21-22
Results

Open-end, Drainage Repair I, North District, FY23-25
Term Contract, Infrastructure
Bidding
$400,000 est. value
Middletown, DE

District-Wide Paving Services
Term Contract
Post-Bid
Bear, DE

HSIP SR 24 at SR 5 / SR 23 Intersection Improvements
Results
DE

Washington Street and Front Street Repaving Project
Infrastructure
Post-Bid
Arden, DE

Pavement and Rehabilitation, Sussex II (Bridgeville - Market St) 2019
Results
Bridgeville, DE 19933

Base Multiple Award Paving Contract
Term Contract
Post-Bid
$500,000 to $1,200,000 est. value
DE

PCC Patching, North, Open End, FY20-22
Results
DE

SR299, SR 1 to Catherine Street
Results
DE 19720

Reported 07/12/2022 09:59 AM
Project Title

Big Oak Park Entry Road Paving Project

Physical Address View project details and contacts
City, State (County) Smyrna, DE 19977   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide the delivery of the product, equipment and set up per the following specifications. These specifications are intended to describe removal of +- 3,000 square feet of deteriorated asphalt, repairing and paving the former deteriorated area, installing a leveling course of asphalt to eliminate the bird bath and pave the +- 50,000 square feet with the wear course. Products must be new-from-factory, unused and of the manufacturer's current production. Supplies must be of sufficient quality, materials and workmanship to provide superior service life and performance.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents