Last Updated | 09/21/2022 01:40 PM |
Project Title | D2 Subway Second CBD Alignment |
Physical Address | View project details and contacts |
City, State (County) | Dallas, TX 75201 (Dallas County) |
Category(s) | Transportation |
Sub-Category(s) | Misc. Structures, Railroad/Subway |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,700,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Commerce alignment begins south of Victory Station. It moves south through a switch off the existing railroad alignment and then proceeds in a southeasterly direction along DART-owned right-of-way within Victory Park in the center of Museum Way and through the parking lot on the west side of the Perot Museum of Nature and Science. Adjacent to the Perot Museum will be an at-grade light rail station (Museum Way Station). After leaving the station southbound, the alignment crosses under Woodall Rodgers Freeway at street level, and then begins its transition underground. The alignment enters a property currently occupied by a parking lot and descends into a tunnel within the portal. The alignment remains underground through the core of Downtown until it reaches IH 345 on the east end of Downtown. After passing under Hord Street near the Dallas World Aquarium, the alignment turns under Griffin Street. Between San Jacinto Avenue and Elm Street would be an underground station (Metro Center Station). This station would provide the ability to transfer to the West Transfer Center, Rosa Parks Plaza, and the West End and Akard light rail stations. After crossing under Main Street, the alignment turns east under Belo Garden and continues under Commerce Street. While under Commerce, another underground station is planned approximately between Akard and Ervay Streets (Commerce Station). After passing under Harwood Street, the alignment turns northeast and diagonally across surface parking lots and between buildings. There would another underground station (CBD East Station) between Main Street and Pacific Avenue. This station would provide opportunities to transfer to buses at the East Transfer Center. After passing under Cesar Chavez Boulevard the alignment would begin the transition back to the surface. This transition or portal would be under IH 345 and adjacent to Swiss Avenue. Immediately after getting back to the surface, the alignment arrives at a switch that allows trains to travel either north or south along rebuilt Good Latimer tracks. As of September 30, 2021, this project is in the conceptual phase. The DART has completed the draft for the environmental impact statement. Design is estimated to take place in late 2021/early 2022. Information regarding contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |