Similar Projects
Longview Farm Pedestrian Guard Rail Replacement
Infrastructure
Bidding
Saint Louis, MO 63141

Repair Building Exterior-Troop B Headquarters and Crime Lab
Infrastructure, Alteration
Bidding
Macon, MO

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Repairs to Exterior and Parking Lots Troop G Headquarters and Crime Lab
Results
Willow Springs, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Rock Bridge High Peach Tree Connector Driveway
Infrastructure
Bidding
Columbia, MO 65203

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Post-Bid
Gladstone, MO

East Side of Ward Parkway - W 83rd Street to W 84th Street
Results
Less than $110,995 est. value
Kansas City, MO 64114

Sidewalks FY21-22 – CWA Missouri River South 2
Infrastructure
Bidding
Kansas City, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

Marlborough Community Infrastructure - Package 3 Hickman Mills Drive
Results
Kansas City, MO

SLBE - Sidewalk Improvements - East side of Benton Boulevard between 21st and 22nd Street
Infrastructure
Bidding
Kansas City, MO 64111

Sidewalk Brick Band Replacement
Post-Bid
Kirksville, MO

Last Updated 06/07/2021 02:10 PM
Project Title

Sidewalk Maintenance and Curb Ramp Construction

Physical Address View project details and contacts
City, State (County) Springfield, MO   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace sidewalks, wheelchair ramps, construction of new wheelchair ramps, remove and replace curb and gutter and driveways, and remove and replace, as well as build new ADA ramps among streets and intersections provided by the Public Works Street Maintenance Department. The contract will consist of the removal and replacement of connecting sidewalks, curb and gutter, and other work as defined in the specifications. The locations of the sidewalks and curb ramps are on residential, collector and arterial streets in all council zones throughout the city

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents