Similar Projects
Duane Arnold Solar I
New Construction, Infrastructure
Conception
$64,000,000 CJ est. value
Palo, IA 52324

142nd Street Waterford Road to North Corporate Limit - ST14-03 - City of Urbandale
Infrastructure
Conception
$710,000 CJ est. value
Urbandale, IA 50323

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

Hangar Pavement Rehabilitation Phase 2 - City of Mason City
Infrastructure
Design
$340,000 CJ est. value
Mason City, IA 50401

Bridge Replacement - PPCB
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Dubuque, IA 52003

PCC Pavement - Grade and New - U.S. 75
Infrastructure
Bidding
$500,000 CJ est. value
Merrill, IA 51038

Structures Demolition Phase I
Infrastructure
Post-Bid
Clinton, IA 52732

Sanitary Sewer Improvements Division 1 Rebid
Infrastructure
Post-Bid
$350,000 CJ est. value
Randolph, IA 51649

Pabst Wetland And Stream Mitigation Bank
Term Contract
Results
Eldora, IA

Des Moines Levee Alterations - Phase C
Infrastructure
Results
$14,200,000 est. value
Des Moines, IA 50982

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

PinSeekers Golf & Entertainment Facility / Tiffin
New Construction, Infrastructure - 49,022 SF
Construction
$11,000,000 CJ est. value
Tiffin, IA 52340

NuStyle Residential Development / Woodbine
New Construction, Infrastructure
Pending Verification
$58,000,000 CJ est. value
Woodbine, IA 51579

Grand Ridge Plat 1
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
West Des Moines, IA 50265

Meredith Drive Preservation 104th Street to 121st Street - ST22-04 - City of Urbandale
Infrastructure
Conception
$2,210,000 CJ est. value
Urbandale, IA 50323

Last Updated 06/12/2023 08:36 AM
Project Title

Water Tower Replacement - City of Denison

Physical Address View project details and contacts
City, State (County) Denison, IA 51442   (Crawford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new water tower estimated to hold between 500,000 and 750,000 gallons. As of February 28, 2022, a design engineer has been selected. No firm timeline has been established for the construction. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of June 12, 2023, no new information available

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents