Similar Projects
RR-21-4573 I-90 AET Plaza Modifications Mile Post 53.6 to Mile Post 79.5
Bidding
Downers Grove, IL

Repair Roads and Concrete
Bidding
$500,000 est. value
Glen Ellyn, IL

Supply of Asphalt Emulsion, Sealer Materials
Term Contract
Post-Bid
West Chicago, IL 60185

Poly Fiber Firm Asphalt Crack Sealant Material
Post-Bid
Downers Grove, IL 60515

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

Three School Asphalt Paving
Results
Naperville, IL 60540

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

RR-21-4577 - Plaza Improvements
Bidding
Downers Grove, IL

Crack Sealing Bituminous Pavement
Term Contract
Post-Bid
Addison, IL 60101

2020 Wayne MET Road Program
Results
Less than $275,000 est. value
Wayne, IL 60184

2021 Crack Sealing Bituminous Pavement
Bidding
Bloomingdale, IL

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

2020 Paving
Results
$196,500 est. value
Wheaton, IL 60189

Herrick MS and Henry Puffer ES Paving Improvements
Bidding
Downers Grove, IL 60515

Central Division – Asphalt Paving Maintenance
Post-Bid

Reported 11/05/2020 12:00 AM
Project Title

20-110 Hot-Mix Asphalt Surface Removal

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60187   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The initial contract term shall be January 1, 2021 through December 31, 2021. The City may elect to extend the term of the contract for two (2) additional one-year terms under the same terms, conditions, and pricing structure of the original agreement. Furnish all labor, equipment, tools, materials, etc. necessary to remove approximately 18,500 square yards of asphalt roadways. Mill HMA Pavement at a nominal depth of two (2) inches or as specified by the Engineer.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents