Similar Projects
Department of Criminal Justice Training New Flat Track - Kentucky Department of Criminal Justice Training
New Construction, Infrastructure
Conception
$13,024,000 est. value
Richmond, KY 40475

Construct Health Sciences Building Near Hospital - Eastern Kentucky University
New Construction, Infrastructure
Conception
$33,150,000 CJ est. value
Richmond, KY 40475

Asphalt
Infrastructure
Post-Bid
KY

ADA Crosswalks Concrete
Infrastructure
Post-Bid
Richmond, KY

Parking Garage Seal, Restripe, And Resurface Coat
Alteration
Results
Richmond, KY

Asphalt Resurfacing - KY 21 and US 25
Infrastructure
Results
KY

Construct New Student Housing - Eastern Kentucky University
New Construction, Infrastructure
Conception
$19,200,000 CJ est. value
Richmond, KY 40475

Exterior Concrete Services
Infrastructure, Alteration
Post-Bid
Richmond, KY

Asphalt Resurfacing - West Main Street (US 25X) (MP 1.363)
Infrastructure
Results
KY

Construct University Hotel and Conference Center - Eastern Kentucky University
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Richmond, KY 40475

Parking Lots Preventative Maintenance and Repairs
Infrastructure
Post-Bid
$70,000 est. value
Richmond, KY 40475

Asphalt Resurfacing - Tates Creek Road (Ky 169) (Mp 2.215)
Infrastructure
Results
Richmond, KY 40476

RFP Design - Model Laboratory School Replacement - Eastern Kentucky University
New Construction, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Richmond, KY 40475

Asphalt Resurfacing - Moran Mill Road (KY 1295) (MP 0.000)
Infrastructure
Results
Richmond, KY 40475

Burrier Building Seating and ADA Compliance
Infrastructure
Results
Richmond, KY 40475

Last Updated 10/03/2022 02:05 AM
Project Title

EKU Meadowbrook Farm Composting Pad

Physical Address View project details and contacts
City, State (County) Richmond, KY 40475   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Notes: - Substantial Date for Completion: 60 days after receipt of PO - Final Date for Completion: 75 days after receipt of PO Liquidated Damages: - $200 per day until Substantial Completion - $100 per day until Final Completion Project Description and Information: This invitation is for construction of a composting pad as specified in the following bid at Eastern Kentucky University's Meadowbrook Farm. The work includes furnishing all labor, materials, equipment and services necessary for the complete construction including all items as indicated throughout the attached specifications. Work will begin immediately following an official Award of Contract and Purchase Order from Eastern Kentucky University. A point of contact for EKU Project Management will be provided to the awarded vendor at time of award. Eastern Kentucky University reserves the right to award in part or in whole and to award multiple suppliers/contracts if in the best interest of the university. A. The EKU Meadowbrook Farm Composing Pad, located at 485 Whitt Road, Richmond, KY 40475 B. Base Bid: Project consists of grubbing site of all vegetation, leveling site with limestone base and extending base ten foot beyond concrete pad limits, compacting stone base, forming a concrete pad 120 foot wide by 150 foot long 6 inch thick minimum with 6x6 - W4xW4 wielding wire mesh reinforcing. Wire mesh shall be supported on stands or pulled into center of concrete during application. Concrete pad perimeter shall be turned down a minimum of 6 inch x 6 inch. Concrete shall be sawed within 48 hours of finishing for control joints at no more than 30 foot increments at a depth of 3 inch. Concrete shall be a 4,000 pound mix. Backfill perimeter with 4 inch of DGA stone ten foot beyond concrete pad limits minimum. C. Alternate 1: Contractor is to provide add alternate for additional concrete to the length of the pad. Alternate shall be per lineal foot of additional concrete.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents