Similar Projects
Prison Land Property Redevelopment
New Construction
Conception
$116,000,000 est. value
Lebanon, OH 45036

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
New Construction
Design
$280,000,000 est. value
Middletown, OH 45005

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

Village of Morrow Phegley Park Upgrade
Infrastructure
Bidding
$250,000 CJ est. value
Morrow, OH 45152

FY22 Deerfield Township Loveland Park Roadway Repair and Resurfacing CDBG Project
Infrastructure
Bidding
$249,975 CJ est. value
Lebanon, OH 45036

Crack Sealing
Infrastructure
Sub-Bidding
$800,850 CJ est. value
Lebanon, OH 45036

Warren County Airport, Install New AWOS III-PT
Infrastructure
Post-Bid
$154,000 CJ est. value
Lebanon, OH 45036

Micro Surface Sealing
Infrastructure
Post-Bid
$300,000 CJ est. value
Bloomfield Township, OH 45640

Holbrook Abatement and Demolition and Louisa Wright Demolition and Sitework
Demolition, Alteration
Results
$269,000 est. value
Lebanon, OH 45036

Fosters Lift Station and Gravity Sewer Improvements
Infrastructure
Results
$9,500,000 est. value
Maineville, OH 45039

Alfons Haar Addition
Addition, Infrastructure - 9,960 SF
Pending Verification
$5,300,000 CJ est. value
Springboro, OH 45066

Cherry Street Reconstruction (Main to New) - 408R-0066
Infrastructure
Design
$1,500,000 est. value
Lebanon, OH 45036

Water Main Replacement From Tolbert to Oxford Middletown Roads
Infrastructure
Bidding
$1,320,000 CJ est. value
Waynesville, OH 45068

Caesar Creek Waterline and Life Station Removal and Replacement
Renovation, Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Waynesville, OH 45068

Glosser Road Pump Station and EQ Improvements
Renovation
Results
$9,750,000 est. value
Lebanon, OH 45036

Last Updated 08/08/2022 02:04 PM
Project Title

2022 Well Redevelopment Project - Rebid

Physical Address View project details and contacts
City, State (County) Franklin, OH 45005   (Warren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $278,692 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the rehabilitation of three drinking water production wells located at a well field in Warren County. The work generally consists of pump removal, video inspection of the well screen and casing, chemical and mechanical redevelopment of the wells, hydraulic and plumbness/alignment testing of wells. The Engineer opinion of probable construction cost for the base bid work is $284,000. The Bidder hereby agrees that the Contract Time shall commence on the date stipulated in the Notice to Proceed which will be issued by the Owner within 14 days of contract execution and to complete the work in accordance with the terms as stated in the Contract, and in accordance with the following schedule milestones: Substantial Completion: 180 Days from Notice to Proceed. Final Completion: Site restoration work completed, and Contract Closeout shall be within 210 days from Notice to Proceed. Any delays in substantial completion of the work that are within the control of the Contractor, their Subcontractor, or Supplier shall be subject to liquidated damages in the sum of $200.00 for each consecutive calendar day that the project extends beyond the substantial completion deadline. See the General Conditions and Supplemental Conditions for the definition and requirements of substantial completion. No interpretations of the meaning of the plans, specifications, or other pre-bid documents will be made to any bidder orally. Every request for such interpretation must be in writing to Kathryn Gilbert at Kathryn.Gilbert@co.warren.oh.us. To be given consideration all questions must be received by 4:00 pm on Thursday, July 14, 2022. A Certified check, cashier check, or letter of credit equal to ten (10) percent of the bid. A letter of credit may only be revocable by the Owner. Upon entering into a contract with the Owner, the contractor must file a performance bond for the amount of the contract, and the bid guaranty will then be return to the successful and unsuccessful bidders upon request The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents