Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,850,000,000 est. value
Tacoma, WA 98405

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Last Updated 01/31/2022 09:39 AM
Project Title

Downtown Aberdeen Revitalization Traffic Improvements

Physical Address View project details and contacts
City, State (County) Aberdeen, WA 98520   (Grays Harbor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of removal of the existing traffic signal system, roadway excavation, HMA roadway reconstruction, stormwater conveyance and treatment improvements, cement concrete curb & gutter and sidewalk construction, pigmented/textured concrete paving, and installation of a new illumination system.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents