Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Louisiana Calm Street
Infrastructure
Post-Bid
$108,487,725 est. value
Saint Louis, MO

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

On-Call Roadway Maintenance
Term Contract
Post-Bid
Town and Country, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Results
Saint Louis, MO

Florissant Road Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Asphalt Repairs
Infrastructure - 9,212 SF
Results
Clayton, MO

Frost Avenue Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

2021 Concrete Pavement Replacement
Infrastructure
Results
Creve Coeur, MO

Paving & Engine Room
Infrastructure
Post-Bid
Breckenridge Hills, MO 63114

Last Updated 02/02/2023 10:49 PM
Project Title

Georgian Trail and Sandalwood Court Concrete Street Reconstruction

Physical Address View project details and contacts
City, State (County) Des Peres, MO 63131   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,846,265 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work consists of the removal and replacement of approximately 2,672 SY of concrete streets, concrete and asphalt driveway aprons, inlets and 21 LF of 12" storm sewer pipe connecting to the existing system. Traffic control and other incidental items shall be included as shown in the specifications. Schedule is flexible, as long as work is completed within sixty calendar days and by November 18, 2022. But once work starts, the contractor must make continous progress per the conditions of the contract. Not less than the prevailing hourly rate of wages shall be paid to all workers performing under this Contract in this area according to the rates determined by the Department of Labor and Industrial Relations of the State of Missouri. A bid security in the amount of ten percent (10%) of the bid amount must accompany each bid in accordance with the Instructions to Bidders. The City reserves the right to accept or reject any bid and to waive any irregularities in the best interest of the City.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents