Similar Projects
Water Main Rehabilitation And Replacement - WD25UT01 - City of Napa
Infrastructure
Conception
$400,000 est. value
Napa, CA 94558

Coombs Street Water Main Upgrade Fifth to Ash - WD24UT05 - City of Napa
Infrastructure
Conception
$300,000 est. value
Napa, CA 94559

Costco Wholesale Warehouse at Napa Pipe
Demolition, New Construction, Infrastructure - 157,417 SF
Design
$14,000,000 CJ est. value
Napa, CA 94558

Costco Wholesale Warehouse at Napa Pipe
Demolition, New Construction, Infrastructure - 157,417 SF
Design
$14,000,000 CJ est. value
Napa, CA 94558

Kearney and Andrea Water Main Replacement Project
Infrastructure
Bidding
$1,150,000 CJ est. value
Saint Helena, CA 94574

Kearney and Andrea Water Main Replacement Project
Infrastructure
Bidding
$1,150,000 CJ est. value
Saint Helena, CA 94574

Path of Travel to Francis Cottage
Term Contract
Post-Bid
$300,000 est. value
Napa, CA 94558

2021 Annual Pavement Management Project
Infrastructure
Post-Bid
$613,700 est. value
American Canyon, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Napa Cove Affordable Apartments
New Construction, Infrastructure
Construction
$36,445,998 CJ est. value
American Canyon, CA 94503

American Canyon Road East Rehabilitation - TR22-0100 - City of American Canyon
Infrastructure
Construction
$200,000 CJ est. value
American Canyon, CA 94503

Castlevale Winery
New Construction, Infrastructure - 21,795 SF
Pending Verification
$2,300,000 CJ est. value
Saint Helena, CA 94574

Element 7 / American Canyon
New Construction, Infrastructure - 7,000 SF
Pending Verification
$2,000,000 CJ est. value
American Canyon, CA 94503

Water Main Rehabilitation And Replacement - WD26UT01 - City of Napa
Alteration
Conception
$400,000 est. value
Napa, CA

Last Updated 01/08/2024 10:08 AM
Project Title

Milliken Trail Repairs

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $4,939,316 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Milliken Raw Water Pipeline consists of approximately 6,500 LF of 16" welded steel pipe, most of which is above ground and supported by redwood saddles. The pipeline runs adjacent to Milliken Creek on an unpaved trail with steep grades on either side, roughly half its length accessible by foot or ATV sized vehicles only. It is used to convey raw, untreated water from a diversion dam to the Milliken Water Treatment Plant. The Atlas Fire in 2017 damaged the pipeline (since repaired) and damaged the trail, including a 263-ft wooden ATV access way. The goal of the Project is to repair the damages to the trail (primarily retaining walls) and replace the ATV access way with a 263-ft steel ATV access way, while also replacing the 348 feet of existing pipeline beside it. The project also includes installation of a 39-ft steel bridge and a 75-ft steel walkway. Portions of this project are FEMA-funded, as indicated on the Bid Schedule. The Project must be fully completed within 126 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about January 9, 2024, but the anticipated start date is provided solely for convenience and is neither certain nor binding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents