Similar Projects
Septic Access Cover Project
Infrastructure
Design
Houlton, ME 04730

Route 11 Water Main Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Fort Kent, ME 04743

(LCP)Light Capital Paving - Presque Isle Area - Region 5
Infrastructure
Bidding
$2,000,000 CJ est. value
Presque Isle, ME 04769

Paving
Infrastructure
Post-Bid
$200,000 CJ est. value
Limestone, ME 04750

Town of St. John Plantation Septic System Bid
Infrastructure
Post-Bid
$400,000 CJ est. value
St John Plt, ME 04743

Large Culvert Replacement
Results
Less than $377,000 est. value
Eagle Lake, ME 04739

Statewide Geotechnical Drilling
Infrastructure
Results

1-GW King Pine Wind Generation Project
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Portage Lake, ME 04768

(LCP)Light Capital Paving - Frenchville Area - Region 5
Infrastructure
Bidding
$2,000,000 CJ est. value
Frenchville, ME 04745

Septic System
Infrastructure
Post-Bid
$20,000 CJ est. value
Frenchville, ME 04745

Large Culvert Replacement
Infrastructure
Results
$516,000 est. value
Fort Fairfield, ME

(LCP)Light Capital Paving - Houlton Area - Region 5
Infrastructure
Bidding
$2,000,000 CJ est. value
Haynesville, ME 04497

Transmission Main Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Houlton, ME 04730

Large Culvert Replacement Project
Infrastructure
Results
$574,000 est. value
Saint Agatha, ME

Route 1 Water Main Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Madawaska, ME 04756

Last Updated 03/18/2023 06:04 AM
Project Title

Large Culvert Replacement - Haynesville, Region 5

Physical Address View project details and contacts
City, State (County) Haynesville, ME 04497   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $496,241 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Goals for Employment of Women and Minorities Per Executive Order 11246, craft tradesperson goals are 6.9% women and .5% minorities employed. MaineDOT DBE Project Attainment Target (PAT) for this Project is 1.9% The lowest responsive bidder must have completed, or successfully complete, a Highway Construction prequalification, or project specific prequalification to be considered for the award of this contract. Description: WIN. 018823.00 Location: In Aroostook County, project is located on Route 2A approx. 1.33 miles north of Glenwood Plantation town line. Outline of Work: Large Culvert Replacement and other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Project Manager Roger Soucy at (207) 624-3431, use electronic RFI form or email questions to RFI-Contracts MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable State Laws. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Large Culvert Replacement - Haynesville, Region 5 We now accept electronic bids for bid packages posted on the website. Electronic bids do not have to be accompanied by paper bids. Please note: The Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents