Similar Projects
Northern Roof Replacement
Alteration
Bidding
$500,000 est. value
Detroit, MI 48202

Historic Fort Wayne Roof Project
Infrastructure, Alteration
Bidding
$300,000 est. value
Detroit, MI 48209

Roof Replacement
Post-Bid
Dearborn, MI

Roof Replacement
Post-Bid
Detroit, MI 48226

Partial Roof Replacement
Results
Dearborn Heights, MI 48125

Roofing Repair and Replacement Services
Term Contract
Results
Allen Park, Dearborn, Detroit, Fort Gratiot, MI 48226

Roof Improvements - Senior Center
Alteration
Bidding
$900,000 est. value
Livonia, MI 48154

2021 Shelter Roof Restoration Project
Alteration
Post-Bid
Wyandotte, MI

Roofing for Southeastern and Bagley
Results
Detroit, MI 48214

Roof Replacement
Alteration
Bidding
$80,000 est. value
Detroit, MI 48235

Buildings 403 and 455 Roofing at DTW
Alteration
Post-Bid
Detroit, MI

2021 DPS Office Metal Roof Replacement
Results
Less than $9,500 est. value
Lincoln, Lincoln Park, MI 48146

Shumate Middle School Roof Replacement
Alteration
Post-Bid
Gibraltar, MI 48173

Frost Middle School Roofing Bid Pack 2
Results
Livonia, MI 48154

2022 Roof Replacement Program
Alteration
Post-Bid
MI 48167

Last Updated 05/26/2022 11:18 PM
Project Title

Cadillac Place - Roof Restoration Phase 1

Physical Address View project details and contacts
City, State (County) Detroit, MI 48202   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. General: Designated roof replacement and related work on Roof Areas: Wing B, Wing D, Wing G, Wing H, Courtyard 10 and Courtyard 14 at the Cadillac Place Building totaling approximately 18,600 sq. ft. of roofing. (a) Wings B, D, G & H; Courtyard 10: New single ply roof assembly; Contractor to remove existing roof system concrete substrate and install a new roof system. Complete work in a manner required by the single ply manufacturer in order to provide the State of Michigan a 20-year material and installation warranty for the entire roof system. (b) Courtyard 14: New single ply roof assembly: Contractor to remove existing roof system and metal decking to existing steel framing; install new metal decking and a new roof system. Complete work in a manner required by the single ply manufacturer in order to provide the State of Michigan a 20-year material and installation warranty for the entire roof system

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents