Similar Projects
Pure Lane Mixed Use
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Crystal River, FL 34429

Sidewalk - Legrone to Copeland Improvement - City of Crystal River
Infrastructure
Conception
$250,000 CJ est. value
Crystal River, FL 34428

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Delta Woods & Pioneer Park Automatic Gates & New Fencing
Infrastructure
Bidding
$400,000 CJ est. value
Hernando, FL 34442

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Road Resurfacing Project for West Citrus Springs Boulevard, North Deltona Boulevard and South Canary Palm Terrace
Infrastructure
Results
Citrus Springs, FL

SR 44 - Resurfacing
Infrastructure
Results
$2,475,900 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

CR 491 Next-Phase Road Widening Project
Infrastructure
Pending Verification
$13,060,332 CJ est. value
Lecanto, FL 34461

CR 491 Next-Phase Road Widening Project
Infrastructure
Pending Verification
$13,060,332 CJ est. value
Lecanto, FL 34461

O'Reilly Auto Parts (HOM) / Homosassa
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Homosassa Spg, FL 34448

Murphy USA #6958/7867 / Inverness
Demolition, New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Inverness, FL 34450

District-Wide Maintenance of Continuous Deflective Separation (CDS) Units
Infrastructure
Post-Bid

Last Updated 06/22/2023 12:09 PM
Project Title

Add Lanes and Reconstruct/Drainage Improvements/Milling and Resurfacing/Base Work

Physical Address View project details and contacts
City, State (County) Inverness, FL 34453   (Citrus County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $21,597,899 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Citrus Road Name: SR 45 (Us 41) Limits: From SR 44 to S of Withlacoochee Trail Bridge Project(s): 25716535201(*) Federal Aid No: D722050B Project(s): 25716535202 Federal Aid No: N/A Project(s): 25716535601 Federal Aid No: N/A Total Roadway Length: 0.936 Miles Contract Days: 532 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.936 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days The improvements under this contract consist of reconstruction of SR 45 (US 41). Work includes milling and resurfacing, widening, reconstruction, building a new closed drainage system with storm water management facilities, trail restoration and landscaping, retention walls, signing and markings, signals, lighting, smart work zone, shared use path, select clearing and grubbing for Whispering Pines Park Trail. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 Add Lanes and Reconstruct/Drainage Improvements/Milling and Resurfacing/Base Work Proposal Budget Estimate: $16,637,870.00

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents