Similar Projects
Dollar General / Niles
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$2,600,000 CJ est. value
Niles, MI 49120

Ontario Trailhead Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Niles, MI 49120

Construction of a Roundabout Including Hot Mix Asphalt Reconstruction, Concrete Pavement, Curb and Gutter, Storm Sewer, Signing and Pavement Markings on Gumwood Road
Infrastructure
Bidding
$872,000 CJ est. value
Niles, MI 49120

Whirlpool Centennial Park Improvements - City of St. Joseph
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Saint Joseph, MI 49085

Public Works Pavement Improvement 2022 - City of Saint Joseph
Infrastructure
Post-Bid
$800,000 CJ est. value
Saint Joseph, MI 49085

Bertrand Road Trench and Widen
Infrastructure
Results
$530,327 CJ est. value
Bertrand Township, MI 49120

Southwest Region - Lean-To's
Renovation, Infrastructure
Results
$2,936,210 CJ est. value
Niles, MI 49120

2023 Downtown Sidewalk Replacement Project
Infrastructure
Construction
$764,409 CJ est. value
Niles, MI 49120

2023 Bond - Eau Claire Public Schools
Addition, Renovation, Infrastructure
Pending Verification
$16,700,000 CJ est. value
Eau Claire, MI 49111

Hollywood Elementary - 2023 Bond - Lakeshore Public Schools
Renovation, Infrastructure
Pending Verification
$1,600,000 CJ est. value
Stevensville, MI 49127

Hot Mix Asphalt Roadway Reconstruction, Cold Milling and Resurfacing, Reconstruction of 4 Bridges, Rehabilitation of 9 Bridges and Pavement Markings on I-94
Demolition, New Construction, Infrastructure
Bidding
$184,501,000 CJ est. value
Stevensville, MI 49127

2022 Water Treatment Plant (WTP) Strategic Capital Improvement Plan (SCIP) Phase II - City of St Joseph
Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Saint Joseph, MI 49085

Sawyer Road Rehabilitation
Infrastructure
Results
$644,680 CJ est. value
Sawyer, MI 49125

2023 Bond - Coloma Community Schools
Renovation, Infrastructure
Pending Verification
$28,250,000 CJ est. value
Coloma, MI 49038

Hot Mix Asphalt Shared-use Path Including Concrete Curb, Gutter and Ramps, Guardrail, Pedestrian Traffic Signals, Storm Sewer, Signing and Pavement Markings on Red Arrow Highway
Infrastructure
Bidding
$674,000 CJ est. value
Sawyer, MI 49125

Last Updated 05/10/2023 03:40 PM
Project Title

Wastewater Treatment Plant Improvements Primary Clarifier No. 3 Addition

Physical Address View project details and contacts
City, State (County) Michiana, MI 49117   (Berrien County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Bidder is to complete the Bid Proposal documents that are included in the Project Specification book (online or hard copy), referring to the table of contents to identify the exact order of these documents. Regardless of how the bid documents are received, a hard copy (paper copy) of the Bid Proposal Documents must be submitted for bidding purposes. No electronically submitted Proposals will be accepted. The Bid Proposal Documents include: Bid Proposal Checklist, and Bid Proposal. The Bidder must provide the signed Bid Proposal Documents in either type written or hand written (in ink) form and clearly and completely set forth all required lump sum amounts, unit prices or other costs in a legible and understandable manner. Illegibility of any work or figure in the proposal may be sufficient cause for rejection of the proposal by the Owners. No electronically submitted Proposals will be accepted. Any conclusions or information obtained or derived from Contract Documents will be at the user's sole risk. Prein&Newhof will maintain in its Grand Rapids office the master copy (hard copy) of the Contract Documents from which all electronic copies are based. In the case of any contract discrepancy, the Master Copy (hard copy) shall be considered the controlling document. 6. FUNDING The work to be performed under this contract will be paid for by local funds. 7. BID SURETY For bid surety requirements, see Section 00 21 13 Instructions to Bidders. 8. RIGHT TO REJECT BIDS The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter. COMMENCEMENT OF WORK Construction activities are to begin as soon as possible following contract award. It is the intent of the Owner to consider award of the contract, to the successful bidder at the May 24, 2023 Sewer Authority Board Meeting SCOPE OF PROJECT The project consists of furnishing all material and constructing the following: . Construction of a 55-ft. diameter primary clarifier and associated piping; . Replacement of a primary sludge pump and associated valves and piping; . Replacement/Relocation of the Recycle Lift Station meter chamber; . Including all associated bypass pumping, sheet piling, earthwork, site piping, mechanical, electrical, controls, restoration and appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents