Similar Projects
Last Updated | 05/10/2023 03:40 PM |
Project Title | Wastewater Treatment Plant Improvements Primary Clarifier No. 3 Addition |
Physical Address | View project details and contacts |
City, State (County) | Michiana, MI 49117 (Berrien County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $750,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Bidder is to complete the Bid Proposal documents that are included in the Project Specification book (online or hard copy), referring to the table of contents to identify the exact order of these documents. Regardless of how the bid documents are received, a hard copy (paper copy) of the Bid Proposal Documents must be submitted for bidding purposes. No electronically submitted Proposals will be accepted. The Bid Proposal Documents include: Bid Proposal Checklist, and Bid Proposal. The Bidder must provide the signed Bid Proposal Documents in either type written or hand written (in ink) form and clearly and completely set forth all required lump sum amounts, unit prices or other costs in a legible and understandable manner. Illegibility of any work or figure in the proposal may be sufficient cause for rejection of the proposal by the Owners. No electronically submitted Proposals will be accepted. Any conclusions or information obtained or derived from Contract Documents will be at the user's sole risk. Prein&Newhof will maintain in its Grand Rapids office the master copy (hard copy) of the Contract Documents from which all electronic copies are based. In the case of any contract discrepancy, the Master Copy (hard copy) shall be considered the controlling document. 6. FUNDING The work to be performed under this contract will be paid for by local funds. 7. BID SURETY For bid surety requirements, see Section 00 21 13 Instructions to Bidders. 8. RIGHT TO REJECT BIDS The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter. COMMENCEMENT OF WORK Construction activities are to begin as soon as possible following contract award. It is the intent of the Owner to consider award of the contract, to the successful bidder at the May 24, 2023 Sewer Authority Board Meeting SCOPE OF PROJECT The project consists of furnishing all material and constructing the following: . Construction of a 55-ft. diameter primary clarifier and associated piping; . Replacement of a primary sludge pump and associated valves and piping; . Replacement/Relocation of the Recycle Lift Station meter chamber; . Including all associated bypass pumping, sheet piling, earthwork, site piping, mechanical, electrical, controls, restoration and appurtenances. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |