Similar Projects
MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

RFP D/B - ADA Playground Equipment for 6 Elementary Locations
Infrastructure
Bidding
$50,000 CJ est. value
Dalton, GA 30721

RFP D/B - Pleasant Grove Elementary Playground Equipment
Infrastructure
Bidding
$45,000 CJ est. value
Dalton, GA 30721

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Miscellaneous HDPE Conduit - Materials Only
Infrastructure
Post-Bid
Dalton, GA

New Driver Services Center - DALTON
New Construction, Infrastructure - 8,010 SF
Results
$2,360,000 CJ est. value
Dalton, GA 30721

Agriculture Meter Installation
Infrastructure
Results

Essentia Protein Solutions Broth Factory
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Dalton, GA 30720

Apron Pavement Rehabilitation - Phase 2
Infrastructure
Bidding
$1,200,000 CJ est. value
Dalton, GA 30721

Dalton City 11 Substation Site Preparation
Infrastructure
Post-Bid
Dalton, GA

Building and Site Improvements for Dalton High School
Renovation, Infrastructure
Results
Dalton, GA 30720

Dalton Parks and Recreation Playground Unit
Infrastructure
Post-Bid
$40,000 CJ est. value
Dalton, GA 30720

Fire Hydrant Installation At Dalton Municipal Airport
Infrastructure
Results
Dalton, GA 30721

Springhill Heights and Pine Valley S/D Sewer Expansion Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Dalton, GA 30720

Last Updated 11/18/2022 05:33 PM
Project Title

RSC West Hill Cemetery Drainage Dalton Project

Physical Address View project details and contacts
City, State (County) Dalton, GA 30720   (Whitfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Services consist of installing a Regenerative Stormwater Conveyance system and expanding the existing dry detention stormwater basins on the site. Work includes removal of trees, excavation, grading, transport of soil to the designated spoils site, and grading of the spoils site. Approximately 3.6 acres will be disturbed during construction. The work shall be done as directed by the plans developed by Arcadis- U.S., Inc. All work shall be performed according to the latest Georgia D.O.T. Standards and Specifications. The advertisement for bids will be open for 30 calendar days starting on Wednesday, October 19. Bid submissions will be for furnishing supervision, materials, labor and equipment required for satisfactorily completing the specified work for a 3-month period beginning tentatively on January 9, 2022. In order to be considered a responsive bidder, the contractor must be in compliance with the Georgia Security and Immigration Compliance Act and shall submit with their bid, a signed and notarized affidavit verifying its compliance with O.C.G.A. 13-10-91. Questions shall be addressed to Jackson Sheppard, by phone at 706-278-7077 or by email jsheppard@daltonga.gov.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents