Similar Projects
HCA Acute Care Hospital
New Construction, Infrastructure
Conception
$41,900,000 CJ est. value
Wildwood, FL 32163

Freedom Fellowship Church Expansion
New Construction, Infrastructure - 19,000 SF
Conception
$6,200,000 CJ est. value
Wildwood, FL 34785

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Sumter County CR 525E 4-Lane Ultimate Improvement From CR 514 to US 301
Infrastructure
Bidding
$600,000 CJ est. value
Sumterville, FL 33585

Resurfacing
Infrastructure
Bidding
$5,283,936 CJ est. value
Bushnell, FL 33513

Sprouts Farmers Market #650 / The Villages
Demolition, New Construction, Infrastructure - 23,256 SF
Post-Bid
$6,200,000 CJ est. value
The Villages, FL 32162

RFQ Engineering - C-466 at C-475N Roundabout Safety Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Wildwood, FL 34785

Directional Bores
Infrastructure
Results
Bushnell, FL

Minor Toll Facility Construction-South Florida
New Construction
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

AAA - Auto Club
Renovation - 2,800 SF
Construction
$232,000 est. value
Wildwood, FL 34785

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

Livano Wildwood
New Construction, Infrastructure - 6,142 SF
Pending Verification
$95,000,000 CJ est. value
Oxford, FL 34484

Upsizing SR44 Phase 2 - 001-802-536-3100 - Sumter County
Infrastructure
Conception
$1,973,000 CJ est. value
Bushnell, FL 33513

Last Updated 03/13/2023 03:08 PM
Project Title

Seco Head Quarters Call Center Shared Space Model Redesign

Physical Address View project details and contacts
City, State (County) Sumterville, FL 33585   (Sumter County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

SECO Energy is seeking responses from qualified vendors interested in providing new modular workstations and or complete cubicle floor plans at our Sumterville HQ location, First Floor, 330 S US301 Sumterville, Fl 33585. The scope of work includes measuring the available / existing space, providing conceptual drawings for proposed configurations and the breakdowns of the proposed options and total cost. SECO's objective is to maximize the space available while producing a well laid out / aesthetically pleasing floor plan that includes semi-private workstations with phone, LAN / internet connectivity and auxiliary power outlets for charging phones, laptops and or I-pads. The proposed floor plan will need to accommodate a minimum of 30 separate / isolated workstations suited for being sub divided into smaller work groups of transient and or permanent employees. Question End Date 3/6/2023 5:00 PM

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents