Similar Projects
Citywide Parks and Playgrounds Package 3
New Construction
Post-Bid
New Orleans, LA

Recreation Center New Play Structure
Renovation
Post-Bid
$291,129 est. value
New Orleans, LA

George Washington Carver Park Improvements - Zone B
New Construction
Results
New Orleans, LA 70118

Alma Peters Playground Improvements
New Construction
Results
New Orleans, LA 70115

New Batting Cage at the Martin Luther King Playground
Renovation, Infrastructure
Post-Bid
Less than $250,000 est. value
Harvey, LA 70058

Pratt Playground Renovations
Renovation
Results
New Orleans, LA

Install a Tot Lot Structure at Girard Playground for the Jefferson Parish Department of Parks and Recreation
Renovation
Post-Bid
Metairie, LA 70003

Install New Tot Lot Play Structures Including Slab, Structures and Safety Surface
New Construction
Results
Less than $250,000 est. value
Gretna, LA

Kennedy Heights and Johnny Jacobs Tennis Court Renovations
Renovation
Post-Bid
Avondale, LA 70094

Install Six Basketball Goals at Owens Playground
New Construction
Results
River Ridge, LA 70123

Multi-Use Tennis Court Remodel
Renovation
Post-Bid
LA

Tennis Court Repairs for Three Playground
New Construction
Results
Less than $250,000 est. value
Marrero, LA 70072

Cut-Off Splash Pad and Walking Path
Infrastructure
Post-Bid
New Orleans, LA 70131

Install one (1) Outdoor Fitness Station at Lasalle Park
New Construction
Results
Less than $250,000 est. value
Gretna, Metairie, LA 70003

Tennis Court Conversion to Beach Volleyball East Campus
Renovation
Post-Bid
$400,000 est. value
LA 70122

Reported 01/29/2022 12:00 AM
Project Title

Kenilworth Playground Repairs

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70126   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive): Kenilworth Playground- 7820 Redfish St. New Orleans, LA 70126: (4) Exterior doors to be removed and replaced. Remove old doors and door frame if needed Remove and dispose of old equipment following proper guidelines Replace door frames if needed Replace damaged doors with steel commercial doors Prime and paint doors Install new hinges Install new door closers Install new low profile handles Install new deadbolt lock mechanisms Check operation and adjust as needed Supply NORDC with 8 sets of keys Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work is complete. Area to be ready for business use when finished. If any equipment is found to be defective it is to be identified to owner for approval of repair/replacement. All material shall conform to the latest issue of all applicable standards established by NEMA, and underwriters laboratories, inc. and shall bear manufacturer ' s trade and brand name. All work shall be installed and completed with the latest rules and regulations of the ASME, NFPA,NEC and all State and local codes and standards and such work not so installed shall be removed and reinstalled at the Contractor ' s expense. Warranties on all furnished equipment and industry standards on parts and labor, all manufacturers warranties should apply. Personal Protective Equipment to be worn at all times and a safe working environment is to be maintained.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents