Similar Projects
High-Tech Logistics Park / Mobile
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Mobile, AL 36602

Canfor Southern Pines Sawmill Complex / Mobile County
New Construction, Infrastructure
Design
$210,000,000 CJ est. value
Axis, AL 36505

Semmes Community Center Park - Shade Structures
Infrastructure
Bidding
$90,000 CJ est. value
Semmes, AL 36575

Perch Creek Area Sanitary Sewer Trunk Line CIPP
Infrastructure
Bidding
$5,400,000 CJ est. value
Mobile, AL 36602

Whistler Street Sidewalk Improvements
Post-Bid
$158,650 to $193,895 est. value
Prichard, AL 36610

Semmes Municipal Complex
New Construction
Post-Bid
Semmes, AL

Copeland-Cox Tennis Center - ADA Improvements
Results
$502,900 est. value
Mobile, AL 36608

Ann Street Rehabilitation
Results
$2,820,874 est. value
Mobile, AL 36628

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

B051A01 System Rehab Phase II
Infrastructure
Bidding
$2,000,000 CJ est. value
Mobile, AL 36602

BFM RW 14 Culvert Extension and Tree Clearing
Infrastructure
Post-Bid
Mobile, AL 36615

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Barry 8 Power Plant Natural Gas Unit
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Bucks, AL 36512

Last Updated 09/23/2022 10:10 AM
Project Title

Twelve Mile Creek Bank Stabilization Museum Drive to University Blvd

Physical Address View project details and contacts
City, State (County) Mobile, AL 36608   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,088,444 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 23, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** No Bid Packages will be issued to Contractors later than twenty-four (24) hours after the Pre-Bid Conference. No questions, whether orally or written, will be addressed after 12:00 p.m. on JULY 20, 2022. Bids must be sealed and have the project name and number marked on the outside of the envelope. The envelope containing bids must be addressed as follows, and delivered to Ms. Lisa Lambert, City Clerk; City of Mobile, P. 0. Box 1827, Mobile, Alabama 36633; "Bid for completion of TWELVE MILE CREEK BANK STABILIZATION MUSEUM DRIVE TO UNIVERSITY BLVD, City of Mobile Project No. 2018-3005-09, in the City of Mobile, Alabama". No bid will be received and considered unless made out on the blank form or Proposal attached, and unless all papers attached hereto are returned with the bid and the Proposal sheet attached. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs. All bidders must make positive efforts to use small and minority owned business and women business enterprises. Each bid shall be accompanied by a check or bid bond for the sum of five percent (5%) of the amount bid (maximum amount of bond $10,000), made payable to the CITY, and certified by a reputable banking institution. These monies shall serve as assurance that within ten (10) days of notice of contract award contemplated in the Proposal, the successful bidder will enter into such contract and file a bond for the execution of same. The performance bond required will be for the amount bid, and labor and material bond shall be one hundred percent (100%) of the amount of contract, and shall be made by a Surety Company acceptable to the City of Mobile and upon the forms of bonds appended hereto. In default of the entering into of such contract and the execution of such bond, the certified check required to accompany such bid shall be forfeited to the City of Mobile, Alabama. These fees shall not be a penalty but damages for delays, or for the additional cost or expenses that the CITY may incur by reason of such default. In addition, the Contractor must furnish to the City at the time of the signing of the Contract a certificate of insurance coverage as provided in the specification which will include comprehensive insurance, Contractor's Automobile Liability Insurance, Owner's Protective Liability Insurance, or a Comprehensive General and Public Liability policy naming the City of Mobile, its agents and employees as additionally insured, and where applicable, subcontractor's Public Liability and Property Damage Insurance. The right is reserved to reject any and/or all bids and to waive informalities and to furnish any item of material or work to change the amount of said Contract. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed according to Section 108.11 of Alabama Department of Transportation Standard Specifications for Highway Construction 2018 Edition. Bidders must be licensed Contractors in the State of Alabama pursuant to Sections 34-8-1 through 34-8-27 of the Code of Alabama of 1975 as amended, and shall indicate State License Number on outside of bid envelope. Any contractor that desires to bid as a prime contractor must possess a Municipal & Utility (MU) Maior Classification or a Highways & Streets (HS) Maior Classification per Section 230-X-.27 of the State of Alabama Licensing Board for General Contractors Administrative Code. The bidder must not be disqualified from bidding on ALDOT projects at the time of the Pre-Bid Conference. The awarding of a contract will require the Contractor to pay the prevailing wage rates for this district that are applicable to the trades engaged in this project. The City of Mobile reserves the right to reject any and all bids and waive informalities in the bidding.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents