Similar Projects
Fred Wild Elementary Building 8 Reroof
Bidding
Sebring, FL 33870

Courthouse Metal Roofing Replacement
Bidding
Vero Beach, FL 32960

Re-Roofing of North Fort Myers High School
Post-Bid
Fort Myers, FL 33903

Re-Roofing Goulds Community
Post-Bid
Homestead, FL 33033

Roofing IDIQ
Renovation
Results
Hurlburt Field, FL 32544

Fire Department Reroofing Project
Results
Crystal River, FL 34428

Inverness Middle School Re-Roofing Building 5A and 5B
Post-Bid
Inverness, FL 34450

Eustis Fisheries Research Lab Reroof Project
Results
Less than $187,000 est. value
Eustis, FL

Residential Re-Roofing Work
Post-Bid
Orlando, FL 32800

Hardening and Retrofitting of the City Hall
Results
Less than $340,000 est. value
Tavares, FL

HVAC System Replacement, Roof Replacement, Supply and Install Solar Energy System at the OHA Executive Office
Post-Bid
Orlando, FL 32803

Fleet Maintenance Roof Extension
Results
Wauchula, FL 33873

Hurricane Loss Mitigation Program HLMP
Post-Bid
Less than $45,500 est. value
Miami, FL 33136

Hurricane Michael Emergency Roof Repairs
Results
Blountstown, FL 32424

2020 Hurricane Loss Mitigation Program
Post-Bid
FL

Last Updated 01/28/2021 12:38 PM
Project Title

Roof Replacement and Designated Repairs for Chocachatti Elementary School

Physical Address View project details and contacts
City, State (County) Brooksville, FL 34601   (Hernando County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $875,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Low Slope Roof Replacement (Buildings 1, 3, 4, and 5) a. Demolition: The existing coping, edge metals, and thru-wall flashings shall be removed along with the existing membrane system down to the existing LWIC roof deck. Once the LWIC is exposed, repairs shall be made to the substrate as needed based on unit cost allowance. The roof area shall be cleaned of all debris, in preparation for the new roof system. b. New low slope roof systems 1) All low slope roof areas: Fully adhere an energy gray 60 mil PVC single ply cap sheet system to the existing LWIC roof deck. 2) Roof Areas 3/E and 3/F: Fully adhere ¼” per foot tapered rigid insulation with a 1 ½” base layer to the LWIC roof deck. Fully adhere a ¼” thick cover board and energy gray 60 mil PVC single ply cap sheet system. 3) Roof Areas 3/G, 4/E, and 5/D: Fully adhere ¼” per foot tapered rigid insulation to the LWIC roof deck. Fully adhere a ¼” thick cover board and energy gray 60 mil PVC single ply cap sheet system. 2. Metal Roof Repair (Buildings 2 and 4) a. Remove sidewall flashings and portions of the metal panel roof system, and make repairs as shown in the details provided within this contract. Remove and replace stucco siding as needed to facilitate repairs. 3. Miscellaneous Conditions a. Roof Drains: To remain in place and be refurbished. b. Roof Access Ladder (Building 3): Remove and replace as shown in the details provided within this contract. c. Roof Access Ladder

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents